BLD-Final | 11/17/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/17/2017 | 11/17/2017 | 11/17/2017 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | DONE |
Dave Hannah
|
|
|
Call when heading over // Sean Phone #: ###-####
|
BLD-Final | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | NR |
Dave Hannah
|
|
|
Sharm Phone #: ###-####
|
FIRE-Final Inspection | 6/22/2017 | 6/22/2017 | 6/22/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 6/12/2017 | 6/15/2017 | 6/15/2017 | A | FAIL |
Jim Page
|
|
|
No pre-test was performed on fire alarm system for area of work prior to life fire safey inspection, fire alarm failed inspection for area of work. Life fire safety inspection will need to be reschedule when fire alarm issues are resolved.
|
BLD-Ceiling Grid Inspection | 5/15/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Dave Hannah
|
|
|
Shawn Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | FAIL |
Dave Hannah
|
|
|
Sean Phone #: ###-#### needs to fix wires out ofplumb
|
BLD-Framing/Rough-in | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Dave Hannah
|
|
|
Shawn-please call when heading that way so Shawn can meet you for questions Phone #: ###-####
|