BLD-Final | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Jim Sly
|
|
|
Keith Phone #: ###-####
|
FIRE-Final Inspection | 2/14/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Jim Page
|
|
|
Life fire safety inspection complete.
|
BLD-Aging Inspection | 1/30/2018 | 1/30/2018 | 1/30/2018 | | PEND |
Jim Storey
|
|
|
ele
|
BLD-Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PART |
Jim Storey
|
|
|
as per Jim Storey - temp ok
|
BLD-Final | 11/13/2017 | 11/14/2017 | 11/14/2017 | P | FAIL |
Jim Storey
|
|
|
Keever Phone #: ###-####
|
FIRE-Final Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Keever Phone #: ###-####
|
FIRE-Final Inspection | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | FAIL |
Troy Cobbley
|
|
|
No city approved plans or small documents.
Keever Phone #: ###-####
|
FIRE-Final Inspection | 11/7/2017 | 11/8/2017 | 11/8/2017 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)
Keever Phone #: ###-####
|
BLD-Footing | 8/9/2017 | 8/10/2017 | 8/10/2017 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####si on site
|