FIRE-Final Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
|
BLD-Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Dave Hannah
|
|
|
David Banks ###-####.
|
BLD-Other | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Dave Hannah
|
|
|
consult on ramp Inspection requested via web by David Banks
|
BLD-Final | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PART |
Dave Hannah
|
|
|
I was told to request a structural final inspection. Dave please give me a call and discuss so we can know what we are supposed to do on this. Phone #: ###-#### Inspection requested via web by David Banks ok for temp occ needs to fix ada rooms door hard ware to rest rooms and fix door landings back door for conf rm
|
FIRE-Final Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PART |
Jim Page
|
|
|
Life fire safety inspection complete for TCO phase 1 and phase 2
|
FIRE-Final Inspection | 7/11/2018 | 7/13/2018 | 7/13/2018 | A | FAIL |
Jim Page
|
|
|
Provide signage for gas valve shut-off on outdoor fire place. Install ceiling in north closet of conference room. Provide fire sprinkler for level 1 landing in east stairwell.
David\ Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/7/2018 | 6/7/2018 | 6/8/2018 | P | PEND |
Dave Hannah
|
|
|
I would like to do a partial grid inspection for cover on the first floor. The entire floor is not ready yet and the electrical is not yet completed and inspected in all areas. The desire is to get what i can inspected so we can move forward with part of the install of tiles but not the entire floor yet
Please call when on site and i will meet you.
Thanks !! Phone #: ###-#### Inspection requested via web by David Banks ok after all other trades ok
|
BLD-Other | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Dave Hannah
|
|
|
Re inspect on shaft wall install in the laundry chutes. Also inspect ceilings on 5th and 4th floors to drop tiles
Please contact me when you are on the way. I will meet you on 2nd floor. Thanks Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Ceiling Grid Inspection | 5/21/2018 | 5/21/2018 | 5/22/2018 | P | PASS |
Dave Hannah
|
|
|
Corridor east of main lobby near pool room Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Ceiling Grid Inspection | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | CANC |
Jim Storey
|
|
|
Re-inspect in pool room and east corridor for drywall cover Phone #: ###-#### Inspection requested via web by David Banks pool rm ceilling ok to cover.
|
BLD-Ceiling Grid Inspection | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Jim Storey
|
|
|
Inspect in pool room and meeting room above grid for cover.
If possible please schedule this for first thing in the morning as we have a drywall crew starting to work tomorrow morning.
Thanks ! Phone #: ###-#### Inspection requested via web by David Banks // conf rm hard soffits ok to cover.
|
BLD-Ceiling Grid Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Dave Hannah
|
|
|
Inspect 1st floor ceilings in lobby area and prefunction area. Call me when you get here and i will meet you downstairs If possible around 9:30 would be best
Thanks Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Ceiling Grid Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Dave Hannah
|
|
|
Re inspect on guest rooms for cover Phone #: ###-#### Inspection requested via web by David Banks ground floor ok
|
BLD-Ceiling Grid Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | A | NR |
Dave Hannah
|
|
|
Inspect 4 guest rooms on 1st floor for cover. Also consult for TCO inspections for later on. Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Ceiling Grid Inspection | 4/19/2018 | 4/19/2018 | 4/20/2018 | A | PASS |
Dave Hannah
|
|
|
Re-inspect on the fire caulking etc. in the above ceiling areas. X28 rooms as well as elevator lobbys and linen and ice rooms. also the laundry chute.
Thanks !! Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Ceiling Grid Inspection | 4/13/2018 | 4/13/2018 | 4/20/2018 | A | PASS |
Dave Hannah
|
|
|
Just a few misc rooms for cover on drop ceilings and misc consultations to make sure we are meeting your expectations.
Thanks !! Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | PASS |
Dave Hannah
|
|
|
Exterior wall in meeting room and consult on stairwell wall Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PASS |
Dave Hannah
|
|
|
inspect 4th and 5th floor corridors Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Aging Inspection | 3/27/2018 | 3/27/2018 | 3/27/2018 | | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | NR |
Dave Hannah
|
|
|
1st floor guest rooms Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Conference | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | CANC |
Dave Hannah
|
|
|
Fire proofing on columns Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
|
BLD-Other | 3/13/2018 | 3/13/2018 | 3/13/2018 | A | PASS |
Dave Hannah
|
|
|
Exterior walls of kitchen Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PART |
Jim Storey
|
|
|
Shaft inspection Phone #: ###-#### Inspection requested via web by David Banks 2 layers on fur out steel studs on 2 layers of wood stud wall/
|
BLD-Other | 3/8/2018 | 3/8/2018 | 3/8/2018 | A | CANC |
Dave Hannah
|
|
|
Please make it a late morning inspection. Interior walls for fire caulking before insulation. Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
|
BLD-Other | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Dave Hannah
|
|
|
Consult on women’s bathroom and board room Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | PASS |
Dave Hannah
|
|
|
guest room exterior walls on first floor and ice room Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 3/1/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Dave Hannah
|
|
|
exterior walls in pool room Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 2/28/2018 | 2/28/2018 | 3/1/2018 | A | PASS |
Dave Hannah
|
|
|
Com room inspecting fire caulk for insulation and drywall Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 2/22/2018 | 2/23/2018 | 2/23/2018 | P | NR |
Dave Hannah
|
|
|
Exterior walls Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 2/22/2018 | 2/23/2018 | 2/22/2018 | A | CANC |
Dave Hannah
|
|
|
Exterior walls Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
|
BLD-Other | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Dave Hannah
|
|
|
West storage rooms elevator lobby and consult on exterior walls in the meeting rooms Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 2/21/2018 | 2/22/2018 | 2/21/2018 | A | CANC |
Dave Hannah
|
|
|
Storage rooms and elevator lobbies ice rooms and linen rooms Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
|
BLD-Other | 2/21/2018 | 2/21/2018 | 2/21/2018 | A | PART |
Dave Hannah
|
|
|
We have a meeting from 8-9 please come after that. Exterior wall inspection on 1st floor Phone #: ###-#### Inspection requested via web by David Banks pass ok to insulate ext walls
|
BLD-Other | 2/7/2018 | 2/8/2018 | 2/9/2018 | P | PASS |
Dave Hannah
|
|
|
2nd and 3rd floor drop ceilings Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 2/6/2018 | 2/6/2018 | 2/6/2018 | A | PASS |
Dave Hannah
|
|
|
5th floor drops Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | NR |
Dave Hannah
|
|
|
5th floor drop ceilings Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | CANC |
Dave Hannah
|
|
|
drops on 5th floor. please try to make it a little later around 2 or 3 if possible Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
|
BLD-Conference | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | DONE |
Dave Hannah
|
|
|
consult on sump pump for elevator and dry wall/fire proofing requirements and structural framing requirements in womens bathroom Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Dave Hannah
|
|
|
1st floor exteriors Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/22/2018 | 1/22/2018 | 1/22/2018 | A | PASS |
Dave Hannah
|
|
|
4th floor drops Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | NR |
Dave Hannah
|
|
|
4th floor drops Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | DONE |
Dave Hannah
|
|
|
Consult on beam in elevator mech.room Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/16/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Dave Hannah
|
|
|
1st exterior walls for prerock Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/12/2018 | 1/12/2018 | 1/12/2018 | P | DONE |
Dave Hannah
|
|
|
1st floor exterior walls and consult on elevator equipment room Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/10/2018 | 1/10/2018 | 1/11/2018 | P | NR |
Dave Hannah
|
|
|
1st floor walls Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Ceiling Grid Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Dave Hannah
|
|
|
Inspect drop ceilings in east wing on second floor. This is the same one i called and cancelled for this morning. Mid afternoon would be great. Thanks !! Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | CANC |
Dave Hannah
|
|
|
Drop ceilings on 2nd floor Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PASS |
Dave Hannah
|
|
|
2nd and 3rd floors exteriors and walls Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PART |
Dave Hannah
|
|
|
pre rock 4th floor and electrical rooms Phone #: ###-#### Inspection requested via web by David Banks rooms ok but do not cover elec rooms
|
BLD-Other | 12/28/2017 | 12/28/2017 | 12/29/2017 | P | PASS |
Dave Hannah
|
|
|
drop ceiling inspection on 3rd floor Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PASS |
Dave Hannah
|
|
|
5th floor pre rock inspection as well as 4th floor wall inspections and consult on 4 inch fire sprinkler pipe Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/26/2017 | 12/27/2017 | 12/27/2017 | A | PASS |
Dave Hannah
|
|
|
Wall inspection on 5th floor for insulation and drywall Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/13/2017 | 12/14/2017 | 12/18/2017 | P | PASS |
Dave Hannah
|
|
|
lid inspection on 4th floor west end as well as consultations on drop box configuration on 5th floor and wall inspections on 5th floor. Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection for exterior walls on 2 and 3 as well as 4th floor drop ceilings. Consultation on 5th floor for room 517 Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/11/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Dave Hannah
|
|
|
5th floor prerock. Alvin from MTI would like you to call before you come so that he can do a walk through on stairwell with us. Alvin Hall 2084848305 Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/11/2017 | 12/12/2017 | 12/11/2017 | A | CANC |
Dave Hannah
|
|
|
5th floor bathroom ceiling. Al from MTI would like you call him before you come he would like to do a walk around with both us. Alvin Hall 2084848305 Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
|
BLD-Other | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | PASS |
Dave Hannah
|
|
|
2nd floor wall between stairs and bathroom drywall Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/7/2017 | 12/7/2017 | 12/8/2017 | P | PASS |
Dave Hannah
|
|
|
prerock on 2nd Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/5/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
Dave Hannah
|
|
|
corridor ceilings on floors 2 and 3 Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/5/2017 | 12/6/2017 | 12/7/2017 | P | PASS |
Dave Hannah
|
|
|
inspection exterior walls on floors 4 and 5 Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/5/2017 | 12/5/2017 | 12/5/2017 | P | PASS |
Dave Hannah
|
|
|
floors 4 and 5 ceiling inspection in corridors and inspect stairwell on east end Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 12/5/2017 | 12/6/2017 | 12/5/2017 | A | CANC |
Dave Hannah
|
|
|
inspection for ceiling in corridors on floors 2 and 3 Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
|
BLD-Ceiling Grid Inspection | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | NR |
Dave Hannah
|
|
|
A grid inspection on 5th flour and a ceiling insulation on 5th floor as well Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 11/29/2017 | 11/30/2017 | 11/30/2017 | A | PASS |
Dave Hannah
|
|
|
Fire caulking inspection on floors 2 and 3 from grid line 8 to grid line 12 to allow install of insulation and 3 foot drywall band on exterior walls. Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 11/27/2017 | 11/27/2017 | 11/29/2017 | P | PASS |
Dave Hannah
|
|
|
Inspection on 3rd floor perimeter drywall and insulation for cover in east wing Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 11/28/2017 | 11/28/2017 | 11/29/2017 | A | PASS |
Dave Hannah
|
|
|
Fire caulking inspection on 2nd floor east wing that we started yesterday to allow insulation throughout and drywall band on exterior walls. Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Other | 11/21/2017 | 11/21/2017 | 11/22/2017 | P | PART |
Dave Hannah
|
|
|
Drywall? Firecaulk inspection on 4th floor east wing and exterior wall insulation on 3rd floor east wing. 1st floor ceiling inspection for drywall cover in all of east wing Phone #: ###-#### Inspection requested via web by David Banks 1st floor ceilings east of elev ok and rms401 thru 412 ok
|
BLD-Other | 11/15/2017 | 11/15/2017 | 11/16/2017 | P | PEND |
Dave Hannah
|
|
|
Drywall screw inspection on 5th floor east wing Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Energy code compliance | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | PART |
Dave Hannah
|
|
|
Re-inspect on 4th floor east wing exterior walls. Fire caulking as well as 3rd floor fire caulking inspection in east wing Phone #: ###-#### Inspection requested via web by David Banks ok to insulate and prerock top of ext walls rms 301 thru 312
|
BLD-Energy code compliance | 11/9/2017 | 11/9/2017 | 11/13/2017 | P | PASS |
Dave Hannah
|
|
|
Need to look at 4th floor east wing areas that are pre-rocked for fire ratings and insulation Phone #: ###-#### Inspection requested via web by David Banks
|
BLD-Framing/Rough-in | 11/1/2017 | 11/2/2017 | 11/3/2017 | A | PART |
Dave Hannah
|
|
|
This is for a re-inspect on 4th floor east wing on the fire caulking Also a consultation on some fireproofing in another area Phone #: ###-#### Inspection requested via web by David Banks rooms 401 thru 412 ok to insulate
|
BLD-Framing/Rough-in | 10/26/2017 | 10/27/2017 | 10/30/2017 | A | NR |
Dave Hannah
|
|
|
Framing Inspection on 4th Floor Grids 1-12! Fire Stopping 4th Floor Grids 1-12! Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Wall Bracing | 10/24/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Dave Hannah
|
|
|
-Parapet Wall Bracing on Tower 2 (rest of roof) -UL System Verification for Trades -Please arrive after 9 if possible. We have a sub meeting from 8 to 9. Thank you. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Other | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | PART |
Dave Hannah
|
|
|
-Prerock inspection on 5th Floor. -Please call 30 minutes before site visit. Phone #: ###-#### Inspection requested via web by Nicholas Miller rm 501 thru 512 ok
|
BLD-Other | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PASS |
Dave Hannah
|
|
|
5th Floor Exterior Wall and Ceiling Insulation Inspection from Grid 1-12! Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Other | 10/13/2017 | 10/16/2017 | 10/16/2017 | P | PART |
Dave Hannah
|
|
|
Fire Stopping on 5th floor. Phone #: ###-#### Inspection requested via web by Nicholas Miller ok to start insulating ext wall
|
BLD-Framing/Rough-in | 10/13/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Dave Hannah
|
|
|
Framing Inspection on 5th Floor. Fire Stopping on 2nd-3rd-4th and 5th floor in Electrical panel room. Anchor Bolts on Main Floor. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Framing/Rough-in | 10/3/2017 | 10/3/2017 | 10/3/2017 | A | CANC |
Dave Hannah
|
|
|
-Exterior Sheathing Phone #: ###-#### Inspection requested via web by Nicholas Miller ok to cover ext on tower one
|
BLD-Other | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | PART |
Brandon Shaw
|
|
|
Pre Rock Inspection First floor Structural Beams. Pre Rock 4th and 5th Floor Corridors Grid 1-12. Pre Rock Inspection 5th floor Bathroom Lids. Insulation Inspection Electrical Equipment Room. Exterior Sheathing Inspection outside of Electrical equipment room.
|
FIRE-Conference | 9/20/2017 | 9/20/2017 | 9/20/2017 | A | DONE |
Jim Page
|
|
|
Noted that I spoke with the superintendent with Headwaters Construction (Chris Stanton, phone number ###-####) about a temporary standpipe being installed, note number 42 of the building permit fire code review gives the specifics of the temporary standpipe being required. Builiding is up to level 5 at the time of this entry with no temp standpipe in place.
|
BLD-Wall cover | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Dave Hannah
|
|
|
-Prerock Inspection for Corridors. -1st, 2nd, and 3rd floors. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Wall Bracing | 9/7/2017 | 9/8/2017 | 9/11/2017 | A | PASS |
Dave Hannah
|
|
|
-Parapet bracing inspection Grid 1-12 -Roof sheathing inspection Grid 1-12 - Prerock Inspection 1st Floor 2nd Floor 3rd Floor 1-12 (corridors) Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Conference | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Dave Hannah
|
|
|
Building consultation for framing, holdowns, prerock, and wall types. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|
BLD-Concrete | 6/9/2017 | 6/9/2017 | 6/9/2017 | A | DONE |
Dave Hannah
|
|
|
Concrete slab pour at 7. MTI will be present. Phone #: ###-#### Inspection requested via web by Nicholas Miller
|