Permit Information
Permit NumberBLD17-00583
StatusFinaled
Name HEADWATERS CONSTRUCTION COMPANY
Site Address 348 S 13TH ST
Project NameHilton Garden Inn
Customer NumberBLD16-04480, GRD17-00003
ePlanReviewYes
Description
(HILTON GARDEN INN) **PROJECT MANAGEMENT-Angie Brosious**5 story wood framed 132 unit hotel building with the first story consisting of meeting, office, mechanical, storage, kitchen, pool and 4 sleeping rooms. The remaining 4 stories consist of sleeping rooms and associated accessory areas. All work per the approved plans and attached engineering. This building is fully fire sprinklered with a NFPA 13 system for area snd height and has an alarm system.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection9/24/20189/24/20189/24/2018PPASS
DetailsJim Page
Final life fire safety inspection complete.
BLD-Final9/24/20189/24/20189/24/2018PPASS
DetailsDave Hannah
David Banks ###-####.
BLD-Other7/24/20187/24/20187/24/2018PPASS
DetailsDave Hannah
consult on ramp Inspection requested via web by David Banks
BLD-Final7/13/20187/16/20187/16/2018APEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other7/13/20187/16/20187/16/2018APART
DetailsDave Hannah
I was told to request a structural final inspection. Dave please give me a call and discuss so we can know what we are supposed to do on this. Phone #: ###-#### Inspection requested via web by David Banks ok for temp occ needs to fix ada rooms door hard ware to rest rooms and fix door landings back door for conf rm
FIRE-Final Inspection7/16/20187/16/20187/16/2018PPART
DetailsJim Page
Life fire safety inspection complete for TCO phase 1 and phase 2
FIRE-Final Inspection7/11/20187/13/20187/13/2018AFAIL
DetailsJim Page
Provide signage for gas valve shut-off on outdoor fire place. Install ceiling in north closet of conference room. Provide fire sprinkler for level 1 landing in east stairwell.

David\ Phone #: ###-####
BLD-Ceiling Grid Inspection6/7/20186/7/20186/8/2018PPEND
DetailsDave Hannah
I would like to do a partial grid inspection for cover on the first floor. The entire floor is not ready yet and the electrical is not yet completed and inspected in all areas. The desire is to get what i can inspected so we can move forward with part of the install of tiles but not the entire floor yet

Please call when on site and i will meet you.

Thanks !! Phone #: ###-#### Inspection requested via web by David Banks ok after all other trades ok
BLD-Other5/30/20185/30/20185/30/2018PPASS
DetailsDave Hannah
Re inspect on shaft wall install in the laundry chutes.
Also inspect ceilings on 5th and 4th floors to drop tiles

Please contact me when you are on the way. I will meet you on 2nd floor. Thanks Phone #: ###-#### Inspection requested via web by David Banks
BLD-Ceiling Grid Inspection5/21/20185/21/20185/22/2018PPASS
DetailsDave Hannah
Corridor east of main lobby near pool room Phone #: ###-#### Inspection requested via web by David Banks
BLD-Ceiling Grid Inspection5/17/20185/18/20185/18/2018ACANC
DetailsJim Storey
Re-inspect in pool room and east corridor for drywall cover Phone #: ###-#### Inspection requested via web by David Banks pool rm ceilling ok to cover.
BLD-Ceiling Grid Inspection5/16/20185/17/20185/17/2018APASS
DetailsJim Storey
Inspect in pool room and meeting room above grid for cover.

If possible please schedule this for first thing in the morning as we have a drywall crew starting to work tomorrow morning.

Thanks ! Phone #: ###-#### Inspection requested via web by David Banks // conf rm hard soffits ok to cover.
BLD-Ceiling Grid Inspection5/9/20185/9/20185/9/2018APASS
DetailsDave Hannah
Inspect 1st floor ceilings in lobby area and prefunction area.
Call me when you get here and i will meet you downstairs
If possible around 9:30 would be best

Thanks Phone #: ###-#### Inspection requested via web by David Banks
BLD-Ceiling Grid Inspection5/3/20185/3/20185/3/2018PPASS
DetailsDave Hannah
Re inspect on guest rooms for cover Phone #: ###-#### Inspection requested via web by David Banks ground floor ok
BLD-Ceiling Grid Inspection5/1/20185/1/20185/1/2018ANR
DetailsDave Hannah
Inspect 4 guest rooms on 1st floor for cover. Also consult for TCO inspections for later on. Phone #: ###-#### Inspection requested via web by David Banks
BLD-Ceiling Grid Inspection4/19/20184/19/20184/20/2018APASS
DetailsDave Hannah
Re-inspect on the fire caulking etc. in the above ceiling areas. X28 rooms as well as elevator lobbys and linen and ice rooms. also the laundry chute.

Thanks !! Phone #: ###-#### Inspection requested via web by David Banks
BLD-Ceiling Grid Inspection4/13/20184/13/20184/20/2018APASS
DetailsDave Hannah
Just a few misc rooms for cover on drop ceilings and misc consultations to make sure we are meeting your expectations.

Thanks !! Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other3/27/20183/28/20183/28/2018APASS
DetailsDave Hannah
Exterior wall in meeting room and consult on stairwell wall Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other3/26/20183/27/20183/27/2018APASS
DetailsDave Hannah
inspect 4th and 5th floor corridors Phone #: ###-#### Inspection requested via web by David Banks
BLD-Aging Inspection3/27/20183/27/20183/27/2018 PASS
DetailsDave Hannah
BLD-Other3/21/20183/21/20183/21/2018PNR
DetailsDave Hannah
1st floor guest rooms Phone #: ###-#### Inspection requested via web by David Banks
BLD-Conference3/13/20183/14/20183/14/2018ACANC
DetailsDave Hannah
Fire proofing on columns Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
BLD-Other3/13/20183/13/20183/13/2018APASS
DetailsDave Hannah
Exterior walls of kitchen Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other3/9/20183/9/20183/9/2018PPART
DetailsJim Storey
Shaft inspection Phone #: ###-#### Inspection requested via web by David Banks 2 layers on fur out steel studs on 2 layers of wood stud wall/
BLD-Other3/8/20183/8/20183/8/2018ACANC
DetailsDave Hannah
Please make it a late morning inspection. Interior walls for fire caulking before insulation. Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
BLD-Other3/7/20183/7/20183/7/2018PPASS
DetailsDave Hannah
Consult on women’s bathroom and board room Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other3/5/20183/5/20183/5/2018PPASS
DetailsDave Hannah
guest room exterior walls on first floor and ice room Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other3/1/20183/1/20183/1/2018APASS
DetailsDave Hannah
exterior walls in pool room Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other2/28/20182/28/20183/1/2018APASS
DetailsDave Hannah
Com room inspecting fire caulk for insulation and drywall Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other2/22/20182/23/20182/23/2018PNR
DetailsDave Hannah
Exterior walls Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other2/22/20182/23/20182/22/2018ACANC
DetailsDave Hannah
Exterior walls Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
BLD-Other2/21/20182/22/20182/22/2018APASS
DetailsDave Hannah
West storage rooms elevator lobby and consult on exterior walls in the meeting rooms Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other2/21/20182/22/20182/21/2018ACANC
DetailsDave Hannah
Storage rooms and elevator lobbies ice rooms and linen rooms Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
BLD-Other2/21/20182/21/20182/21/2018APART
DetailsDave Hannah
We have a meeting from 8-9 please come after that. Exterior wall inspection on 1st floor Phone #: ###-#### Inspection requested via web by David Banks pass ok to insulate ext walls
BLD-Other2/7/20182/8/20182/9/2018PPASS
DetailsDave Hannah
2nd and 3rd floor drop ceilings Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other2/6/20182/6/20182/6/2018APASS
DetailsDave Hannah
5th floor drops Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other2/2/20182/5/20182/5/2018ANR
DetailsDave Hannah
5th floor drop ceilings Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other2/2/20182/2/20182/2/2018PCANC
DetailsDave Hannah
drops on 5th floor. please try to make it a little later around 2 or 3 if possible Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
BLD-Conference1/24/20181/25/20181/25/2018ADONE
DetailsDave Hannah
consult on sump pump for elevator and dry wall/fire proofing requirements and structural framing requirements in womens bathroom Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/24/20181/25/20181/25/2018APASS
DetailsDave Hannah
1st floor exteriors Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/22/20181/22/20181/22/2018APASS
DetailsDave Hannah
4th floor drops Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/19/20181/19/20181/19/2018PNR
DetailsDave Hannah
4th floor drops Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/16/20181/17/20181/17/2018ADONE
DetailsDave Hannah
Consult on beam in elevator mech.room Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/16/20181/16/20181/16/2018APASS
DetailsDave Hannah
1st exterior walls for prerock Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/12/20181/12/20181/12/2018PDONE
DetailsDave Hannah
1st floor exterior walls and consult on elevator equipment room Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/10/20181/10/20181/11/2018PNR
DetailsDave Hannah
1st floor walls Phone #: ###-#### Inspection requested via web by David Banks
BLD-Ceiling Grid Inspection1/8/20181/8/20181/8/2018PPASS
DetailsDave Hannah
Inspect drop ceilings in east wing on second floor. This is the same one i called and cancelled for this morning. Mid afternoon would be great.
Thanks !! Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/5/20181/8/20181/8/2018ACANC
DetailsDave Hannah
Drop ceilings on 2nd floor Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other1/2/20181/3/20181/3/2018APASS
DetailsDave Hannah
2nd and 3rd floors exteriors and walls Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/28/201712/29/201712/29/2017APART
DetailsDave Hannah
pre rock 4th floor and electrical rooms Phone #: ###-#### Inspection requested via web by David Banks rooms ok but do not cover elec rooms
BLD-Other12/28/201712/28/201712/29/2017PPASS
DetailsDave Hannah
drop ceiling inspection on 3rd floor Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/27/201712/28/201712/28/2017APASS
DetailsDave Hannah
5th floor pre rock inspection as well as 4th floor wall inspections and consult on 4 inch fire sprinkler pipe Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/26/201712/27/201712/27/2017APASS
DetailsDave Hannah
Wall inspection on 5th floor for insulation and drywall Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/13/201712/14/201712/18/2017PPASS
DetailsDave Hannah
lid inspection on 4th floor west end as well as consultations on drop box configuration on 5th floor and wall inspections on 5th floor. Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/15/201712/18/201712/18/2017APASS
DetailsDave Hannah
Inspection for exterior walls on 2 and 3 as well as 4th floor drop ceilings. Consultation on 5th floor for room 517 Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/11/201712/12/201712/12/2017PPASS
DetailsDave Hannah
5th floor prerock. Alvin from MTI would like you to call before you come so that he can do a walk through on stairwell with us. Alvin Hall 2084848305 Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/11/201712/12/201712/11/2017ACANC
DetailsDave Hannah
5th floor bathroom ceiling. Al from MTI would like you call him before you come he would like to do a walk around with both us. Alvin Hall 2084848305 Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
BLD-Other12/8/201712/11/201712/11/2017APASS
DetailsDave Hannah
2nd floor wall between stairs and bathroom drywall Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/7/201712/7/201712/8/2017PPASS
DetailsDave Hannah
prerock on 2nd Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/5/201712/7/201712/7/2017APASS
DetailsDave Hannah
corridor ceilings on floors 2 and 3 Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/5/201712/6/201712/7/2017PPASS
DetailsDave Hannah
inspection exterior walls on floors 4 and 5 Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/5/201712/5/201712/5/2017PPASS
DetailsDave Hannah
floors 4 and 5 ceiling inspection in corridors and inspect stairwell on east end Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other12/5/201712/6/201712/5/2017ACANC
DetailsDave Hannah
inspection for ceiling in corridors on floors 2 and 3 Phone #: ###-#### >> Inspection requested via web by David Banks Inspection cancelled from web by: David Banks
BLD-Ceiling Grid Inspection12/1/201712/4/201712/4/2017ANR
DetailsDave Hannah
A grid inspection on 5th flour and a ceiling insulation on 5th floor as well Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other11/29/201711/30/201711/30/2017APASS
DetailsDave Hannah
Fire caulking inspection on floors 2 and 3 from grid line 8 to grid line 12 to allow install of insulation and 3 foot drywall band on exterior walls. Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other11/27/201711/27/201711/29/2017PPASS
DetailsDave Hannah
Inspection on 3rd floor perimeter drywall and insulation for cover in east wing Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other11/28/201711/28/201711/29/2017APASS
DetailsDave Hannah
Fire caulking inspection on 2nd floor east wing that we started yesterday to allow insulation throughout and drywall band on exterior walls. Phone #: ###-#### Inspection requested via web by David Banks
BLD-Other11/21/201711/21/201711/22/2017PPART
DetailsDave Hannah
Drywall? Firecaulk inspection on 4th floor east wing and exterior wall insulation on 3rd floor east wing. 1st floor ceiling inspection for drywall cover in all of east wing Phone #: ###-#### Inspection requested via web by David Banks 1st floor ceilings east of elev ok and rms401 thru 412 ok
BLD-Other11/15/201711/15/201711/16/2017PPEND
DetailsDave Hannah
Drywall screw inspection on 5th floor east wing Phone #: ###-#### Inspection requested via web by David Banks
BLD-Energy code compliance11/13/201711/13/201711/13/2017PPART
DetailsDave Hannah
Re-inspect on 4th floor east wing exterior walls. Fire caulking as well as 3rd floor fire caulking inspection in east wing Phone #: ###-#### Inspection requested via web by David Banks ok to insulate and prerock top of ext walls rms 301 thru 312
BLD-Energy code compliance11/9/201711/9/201711/13/2017PPASS
DetailsDave Hannah
Need to look at 4th floor east wing areas that are pre-rocked for fire ratings and insulation Phone #: ###-#### Inspection requested via web by David Banks
BLD-Framing/Rough-in11/1/201711/2/201711/3/2017APART
DetailsDave Hannah
This is for a re-inspect on 4th floor east wing on the fire caulking
Also a consultation on some fireproofing in another area Phone #: ###-#### Inspection requested via web by David Banks rooms 401 thru 412 ok to insulate
BLD-Framing/Rough-in10/26/201710/27/201710/30/2017ANR
DetailsDave Hannah
Framing Inspection on 4th Floor Grids 1-12! Fire Stopping 4th Floor Grids 1-12! Phone #: ###-#### Inspection requested via web by Nicholas Miller
BLD-Wall Bracing10/24/201710/24/201710/24/2017APASS
DetailsDave Hannah
-Parapet Wall Bracing on Tower 2 (rest of roof)
-UL System Verification for Trades
-Please arrive after 9 if possible. We have a sub meeting from 8 to 9. Thank you. Phone #: ###-#### Inspection requested via web by Nicholas Miller
BLD-Other10/23/201710/23/201710/23/2017PPART
DetailsDave Hannah
-Prerock inspection on 5th Floor.
-Please call 30 minutes before site visit. Phone #: ###-#### Inspection requested via web by Nicholas Miller rm 501 thru 512 ok
BLD-Other10/19/201710/20/201710/20/2017APASS
DetailsDave Hannah
5th Floor Exterior Wall and Ceiling Insulation Inspection from Grid 1-12! Phone #: ###-#### Inspection requested via web by Nicholas Miller
BLD-Other10/13/201710/16/201710/16/2017PPART
DetailsDave Hannah
Fire Stopping on 5th floor. Phone #: ###-#### Inspection requested via web by Nicholas Miller ok to start insulating ext wall
BLD-Framing/Rough-in10/13/201710/13/201710/13/2017APASS
DetailsDave Hannah
Framing Inspection on 5th Floor. Fire Stopping on 2nd-3rd-4th and 5th floor in Electrical panel room. Anchor Bolts on Main Floor. Phone #: ###-#### Inspection requested via web by Nicholas Miller
BLD-Framing/Rough-in10/3/201710/3/201710/3/2017ACANC
DetailsDave Hannah
-Exterior Sheathing
Phone #: ###-#### Inspection requested via web by Nicholas Miller ok to cover ext on tower one
BLD-Other9/26/20179/27/20179/27/2017APART
DetailsBrandon Shaw
Pre Rock Inspection First floor Structural Beams.
Pre Rock 4th and 5th Floor Corridors Grid 1-12.
Pre Rock Inspection 5th floor Bathroom Lids.
Insulation Inspection Electrical Equipment Room.
Exterior Sheathing Inspection outside of Electrical equipment room.
FIRE-Conference9/20/20179/20/20179/20/2017ADONE
DetailsJim Page
Noted that I spoke with the superintendent with Headwaters Construction (Chris Stanton, phone number ###-####) about a temporary standpipe being installed, note number 42 of the building permit fire code review gives the specifics of the temporary standpipe being required. Builiding is up to level 5 at the time of this entry with no temp standpipe in place.
BLD-Wall cover9/11/20179/12/20179/12/2017APASS
DetailsDave Hannah
-Prerock Inspection for Corridors.
-1st, 2nd, and 3rd floors. Phone #: ###-#### Inspection requested via web by Nicholas Miller
BLD-Wall Bracing9/7/20179/8/20179/11/2017APASS
DetailsDave Hannah
-Parapet bracing inspection Grid 1-12
-Roof sheathing inspection Grid 1-12
- Prerock Inspection 1st Floor 2nd Floor 3rd Floor 1-12 (corridors) Phone #: ###-#### Inspection requested via web by Nicholas Miller
BLD-Conference8/23/20178/24/20178/24/2017APASS
DetailsDave Hannah
Building consultation for framing, holdowns, prerock, and wall types. Phone #: ###-#### Inspection requested via web by Nicholas Miller
BLD-Concrete6/9/20176/9/20176/9/2017ADONE
DetailsDave Hannah
Concrete slab pour at 7. MTI will be present. Phone #: ###-#### Inspection requested via web by Nicholas Miller