BLD-Final | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Tony Young
|
|
|
ok per 425
|
BLD-Aging Inspection | 11/30/2017 | 11/30/2017 | 12/1/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/29/2017 | 11/29/2017 | 12/1/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PEND |
Dave Hannah
|
|
|
Dan Phone #: ###-#### ok to final after zoning finals
|
BLD-Wall cover | 7/17/2017 | 7/18/2017 | 7/18/2017 | P | PART |
Tony Young
|
|
|
// Dan Phone #: ###-####,, drywall on exterior south side,, not ready,, NOTE: new garage is away from fence further than the old one,, (walking room now) and set back from alley further also,, eaves on south have been cut back.. drywall not up yet,, also measured from fence to fence on the alley side,, less than 50',, ok to cover OSB
|
BLD-Framing/Rough-in | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | PART |
Tony Young
|
|
|
Call to meet // Dan Phone #: ###-####,, exterior shear ok,, contractor will add 1 layer of 5/8th sheetrock to south wall due to fence location,, p/l appears to be on other side of the fence
|
BLD-Framing/Rough-in | 7/13/2017 | 7/14/2017 | 7/14/2017 | P | FAIL |
Jim Storey
|
|
|
Dan Phone #: ###-#### c/n posted
|
BLD-Footing | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PART |
Jim Sly
|
|
|
michael Phone #: ###-#### Footing OK if placed so that Eve of structure on S. side is min. 3 foot from property line.
|
BLD-Footing | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | FAIL |
Brandon Shaw
|
|
|
rick Phone #: ###-#### Per Plans, 3' set back from property line to eave.
|