Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD17-00961
StatusFinaled
Name CITY OF BOISE
Site Address 150 N CAPITOL BLVD
Project NameMayor's Office TI
Customer Number 
ePlanReviewYes
Description
(BOISE CITY HALL – Mayor’s Office) Permit is to combine an existing office space and part of an existing reception space to create a 300 sq. ft. office space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, construction of select nonbearing walls. Interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/6/201710/6/201710/6/2017PPASS
DetailsDave Hannah
Call half hour before // Keith Phone #: ###-####
DOC - Permit Finaled10/6/201710/6/201710/6/2017PPASS
DetailsDave Hannah
FIRE-Final Inspection10/6/201710/6/201710/6/2017PPASS
DetailsJim Page
No fire sprinkler modifications, fire alarm inspection is complete, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection for area of work passed/complete.
FIRE-Final Inspection8/4/20178/4/20178/4/2017PFAIL
DetailsTroy Cobbley
One of the two smoke detectors is located too close to an air register (3'-0" min.). A permit is required for this work.
BLD-Ceiling Grid Inspection5/25/20175/25/20175/25/2017PPASS
DetailsDave Hannah
Brad-they would like as early as possible Phone #: ###-####
BLD-Framing/Rough-in5/8/20175/8/20175/8/2017PPASS
DetailsDave Hannah
Brad-mayor''s office Phone #: ###-####