BLD-Final | 9/13/2017 | 9/14/2017 | 9/14/2017 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
DOC - Permit Finaled | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 7/12/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
BLD-Framing/Rough-in | 7/7/2017 | 7/7/2017 | 7/7/2017 | P | PASS |
Dave Hannah
|
|
|
Maximus Phone #: ###-####
|
BLD-Framing/Rough-in | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | NR |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Wall Bracing | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | PASS |
Dave Hannah
|
|
|
Shear // Zack Phone #: ###-####
|
BLD-Foundation | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | PASS |
Dave Hannah
|
|
|
insulation // Zack Phone #: ###-####
|
BLD-Foundation | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Brandon Shaw
|
|
|
Adam Phone #: ###-#### Already poured at time of inspection, no one or plans on site.
|
BLD-Footing | 5/4/2017 | 5/5/2017 | 5/5/2017 | A | PASS |
Dave Hannah
|
|
|
Mike-pour time 10:00 Phone #: ###-####
|