BLD-Final | 12/6/2017 | 12/6/2017 | 12/7/2017 | P | PASS |
Jim Sly
|
|
|
call for garage code// Brandon Phone #: ###-####
|
DOC - Permit Finaled | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 8/9/2017 | 8/10/2017 | 8/10/2017 | A | PASS |
Tony Young
|
|
|
brandon Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PASS |
Tony Young
|
|
|
Brandon Phone #: ###-####
|
BLD-Conference | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | PART |
Tony Young
|
|
|
Brandon Phone #: ###-#### frame walk through conference only, footings were looked at with other townhouse, just this one was not called in,, ok
|
BLD-Framing/Rough-in | 8/3/2017 | 8/3/2017 | 8/3/2017 | P | FAIL |
Tony Young
|
|
|
Brandon Phone #: ###-####,, need trades
|