BLD-Energy code compliance | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | CANC |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PART |
Mike Jordan
|
|
|
concrete at 1:30 // Marty ###-####
|
FIRE-Final Inspection | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | CANC |
Jim Page
|
|
|
Russ-can you do as early as possible so the building final can be done as late as possible Phone #: ###-####-after talking to Jim Page-we think the inspection was scheduled for the wrong address and/or permit #-Called Russ to make sure his inspection was done-he's said everything was fine
|