BLD-Final | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | DONE |
Jim Sly
|
|
|
Steve Phone #: ###-#### WIP.
|
BLD-Conference | 2/28/2018 | 3/8/2018 | 3/8/2018 | A | DONE |
Jim Sly
|
|
|
Frame and Energy Code.....OK.
|
BLD-Framing/Rough-in | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Conference | 2/27/2018 | 2/27/2018 | 2/28/2018 | P | DONE |
Jim Sly
|
|
|
Working outside of scope, complaint of bathroom added with no approval or permits / CZC17-00131 for Planning approval - Christina Phone #: ###-#### C/N posted
|
BLD-Framing/Rough-in | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | PART |
Jim Sly
|
|
|
nails- Steve Phone #: ###-#### Exterior shear nailing and straps only......OK.
|
BLD-Foundation | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Jim Sly
|
|
|
Please call ahead for access - Steve Phone #: ###-####
|
BLD-Footing | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Jim Sly
|
|
|
Steve-would like as soon as possible Phone #: ###-####
|