BLD-Final | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | PASS |
Tony Young
|
|
|
Duane-please call 30 minutes prior for accesss Phone #: ###-####
|
DOC - Permit Finaled | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/13/2017 | 6/14/2017 | 6/14/2017 | A | PASS |
Tony Young
|
|
|
call prior // Duane Phone #: ###-####
|
BLD-Framing/Rough-in | 6/12/2017 | 6/13/2017 | 6/13/2017 | A | PART |
Tony Young
|
|
|
call prior // Duane Phone #: ###-####,, needs fireplace permit and pass,, then ok
|
BLD-Footing | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Tony Young
|
|
|
Duane-please call 30 minutes prior to meet Phone #: ###-####,, interior pad footings
|
BLD-Conference | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | DONE |
Brandon Shaw
|
|
|
Call 30 min before // Duane Phone #: ###-#### Talked with contractor, removing old bearing point pad in crawl, west end, adding new 30" X 30" pad for new post.
|