BLD-Final | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Tony Young
|
|
|
Goldy Phone #: ###-####
|
DOC - Permit Finaled | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Tony Young
|
|
|
Goldie Phone #: ###-####
|
BLD-Framing/Rough-in | 9/6/2017 | 9/6/2017 | 9/6/2017 | P | PASS |
Jim Sly
|
|
|
Goldie Phone #: ###-####
|
BLD-Wall Bracing | 8/9/2017 | 8/10/2017 | 8/10/2017 | P | PASS |
Tony Young
|
|
|
Goldy Phone #: ###-####
|
BLD-Foundation | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Tony Young
|
|
|
CONCRETE AT 10AM Terry Phone #: ###-####
|
BLD-Conference | 6/22/2017 | 6/22/2017 | 6/26/2017 | P | PART |
Tony Young
|
|
|
Goldy Phone #: ###-####,, sewer line passes through footing,, called plumbing super,, said he was ok as long as they wrap with foam,, contractor will make a bond beam above so loads dont effect,, small loads coming down
|
BLD-Footing | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### Tony inspected and OK'd Sewer line thru footing.
|