BLD-Final | 11/28/2017 | 11/28/2017 | 11/28/2017 | P | PASS |
Brandon Shaw
|
|
|
tim Phone #: ###-####
|
DOC - Permit Finaled | 11/28/2017 | 11/28/2017 | 11/28/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 11/21/2017 | 11/22/2017 | 11/24/2017 | A | NH |
Brandon Shaw
|
|
|
Need Public Works to sign off Flood Elevation Cert
|
BLD-Wall Bracing | 9/20/2017 | 9/21/2017 | 9/21/2017 | A | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
BLD-Energy code compliance | 9/15/2017 | 9/15/2017 | 9/18/2017 | P | PEND |
Brandon Shaw
|
|
|
Framing/shear corrections to be met first
|
BLD-Framing/Rough-in | 9/15/2017 | 9/15/2017 | 9/18/2017 | P | FAIL |
Brandon Shaw
|
|
|
Shear and framing corrections not made satisfactory
|
BLD-Energy code compliance | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | DEFR |
Jim Storey
|
|
|
Tim Phone #: ###-####to pm
|
BLD-Framing/Rough-in | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | FAIL |
Brandon Shaw
|
|
|
Shear corrections not done Framing- 4x8 headers, 2 locations, 2 2x6 point load, bearing to foundation See red paint and crayon circles on plans OK to insulate
|
BLD-Wall Bracing | 8/29/2017 | 8/30/2017 | 8/30/2017 | A | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
BLD-Foundation | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | PASS |
Brandon Shaw
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 7/10/2017 | 7/11/2017 | 7/11/2017 | P | PASS |
Brandon Shaw
|
|
|
1 if possible (informed him i can''t guarantee time) // Tim Phone #: ###-####
|