BLD-Final | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/29/2017 | 8/30/2017 | 8/30/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in place with current inspection tag, suite number will be installed before final building inspection. Final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Tony Young
|
|
|
Greg Phone #: ###-####,, ok pending trades
|
BLD-Framing/Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Concrete | 7/12/2017 | 7/12/2017 | 7/13/2017 | P | PASS |
Tony Young
|
|
|
Last of day requested - Greg Phone #: ###-####,, slab
|
FIRE-Conference | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | DONE |
Katie Marron
|
|
|
Phone Call with Greg from Canning Construction to clarify that no new RTUs are being installed. All RTUs and smoke detectors are existing from Core and Shell Permit, therefore, no fire alarm work will be required.
|