BLD-Final | 10/18/2017 | 10/18/2017 | 10/18/2017 | P | PASS |
Dave Hannah
|
|
|
good morning. its my understanding that the plumbing is or will be finalled by this afternoon. Thanks! Phone #: ###-#### Inspection requested via web by Tim Bergey
|
FIRE-Final Inspection | 10/16/2017 | 10/17/2017 | 10/17/2017 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in place and will be tagged accordingly. Final life fire safety inspection passed/complete.
|
BLD-Conference | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Dave Hannah
|
|
|
Thanks Dave Phone #: ###-#### Inspection requested via web by Tim Bergey
|
FIRE-Final Inspection | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | FAIL |
Jim Page
|
|
|
Provide emergency lighting under mezzanine/stair area as shown on city approved drawings. Provide emergency lighting for exit discharge as shown on city approved drawings. Provide fire extinguishers both on the main level and the mezzanine level per note number 6 of the building permit fire code review comments.
|
BLD-Framing/Rough-in | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|