BLD-Final | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-####
|
BLD-Final | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 1/5/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Jim Page
|
|
|
Exit sign by rear sliding glass door has been changed to emergency egress lighting, final life fire safety inspection complete.
|
BLD-Final | 12/14/2017 | 12/15/2017 | 12/14/2017 | A | PART |
Jim Storey
|
|
|
Jose Phone #: ###-#### temp ok/ remove sign
|
FIRE-Final Inspection | 12/13/2017 | 12/14/2017 | 12/14/2017 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by front entry, fuel system inspection complete by fire department. Partial final inspection complete for life fire safey, door hardware for rear sliding glass door needs to be changed to be code compliant, 30 day TCO approved for life fire safety per conversation with Scott Arellano.
|
BLD-Final | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | NR |
Jim Storey
|
|
|
Jose Phone #: ###-####
|
BLD-Energy code compliance | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-####
|
BLD-Framing/Rough-in | 11/20/2017 | 11/20/2017 | 11/21/2017 | P | PASS |
Jim Storey
|
|
|
jose Phone #: ###-####
|
BLD-Framing/Rough-in | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PASS |
Jim Storey
|
|
|
partial framing // jose Phone #: ###-#### north wall west corner ok
|
BLD-Concrete | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PASS |
Jim Storey
|
|
|
rebar- Shawn Phone #: ###-#### si pending as directed rh
|
BLD-Footing | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-#### pending si report
|