Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD17-01581
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 2300 S APPLE ST
Project NameAlbertsons Fuel Express
Customer NumberBLD17-02245 DEMO
ePlanReviewYes
Description
(ALBERTSONS EXPRESS)**Project Management-Ron Hill** ""PLAN MODIFICATION TO RELOCATE THE DRIVE-THRU WINDOW""" Demo existing building (BLD17-02245), and construct a new 3,027 sf Convenience store and 4,365 sf noncombustible fuel canopy with (6) fuel dispensers, (2) underground fuel storage tanks and associated paving, planters and curbs per the approved plans. A separate Fire Department Operational permit is required; as regulated by Boise Fire Department. (Contact 570-6500) . This building is not fire sprinklered. Special inspections are required per the attached form 310. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/8/20181/9/20181/9/2018APASS
DetailsJim Storey
Jose Phone #: ###-####
BLD-Final1/8/20181/8/20181/8/2018PPASS
DetailsJim Storey
FIRE-Final Inspection1/5/20181/5/20181/5/2018APASS
DetailsJim Page
Exit sign by rear sliding glass door has been changed to emergency egress lighting, final life fire safety inspection complete.
BLD-Final12/14/201712/15/201712/14/2017APART
DetailsJim Storey
Jose Phone #: ###-#### temp ok/ remove sign
FIRE-Final Inspection12/13/201712/14/201712/14/2017PPART
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by front entry, fuel system inspection complete by fire department. Partial final inspection complete for life fire safey, door hardware for rear sliding glass door needs to be changed to be code compliant, 30 day TCO approved for life fire safety per conversation with Scott Arellano.
BLD-Final12/12/201712/12/201712/12/2017PNR
DetailsJim Storey
Jose Phone #: ###-####
BLD-Energy code compliance11/21/201711/21/201711/21/2017PPASS
DetailsJim Storey
Jose Phone #: ###-####
BLD-Framing/Rough-in11/20/201711/20/201711/21/2017PPASS
DetailsJim Storey
jose Phone #: ###-####
BLD-Framing/Rough-in11/13/201711/14/201711/14/2017APASS
DetailsJim Storey
partial framing // jose Phone #: ###-#### north wall west corner ok
BLD-Concrete8/16/20178/16/20178/16/2017PPASS
DetailsJim Storey
rebar- Shawn Phone #: ###-#### si pending as directed rh
BLD-Footing8/14/20178/14/20178/14/2017PPASS
DetailsJim Storey
Jose Phone #: ###-#### pending si report