BLD-Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Mike Jordan
|
|
|
Zach Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Mike Jordan
|
|
|
Jack Phone #: ###-####. All issues have been resolved.
|
FIRE-Final Inspection | 7/5/2018 | 7/5/2018 | 7/6/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need plan review approval of the doors being sliding not swinging out of Corridor 105 and that the door hardware is approved on the sliding doors (it requires fingers to open).
Jack Phone #: ###-####
|
FIRE-Final Inspection | 6/29/2018 | 7/2/2018 | 7/2/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit signs/repair exit signs as shown on the city approved plans, provide annual inspection for the expired fire extinguishers, provide plan review approval of the door hardware/door swing in the new areas.
Jack Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Mike Jordan
|
|
|
Matt Phone #: ###-####
|
BLD-Other | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | DONE |
Brandon Shaw
|
|
|
Jack--pre-final for one area
No issues
|
BLD-Framing/Rough-in | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Phase 4- OK to cover
|
BLD-Ceiling Grid Inspection | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PEND |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Pending plan mod. resubmittal.
|
BLD-Framing/Rough-in | 1/3/2018 | 1/4/2018 | 1/4/2018 | P | PEND |
Mike Jordan
|
|
|
Jack Phone #: ###-####. Phase 4 interior steel stud framed walls and lids fro future grid. new drawings and engineering has been completed and is being submitted as a plan mod for review. noted to contractor ok to sheet rock interior walls with the understanding that any changes from plan rewiew will need to be corrected. ceiling id grid geilng and will be accesible for inspections if needed.
|
BLD-Framing/Rough-in | 12/20/2017 | 12/22/2017 | 12/22/2017 | P | FAIL |
Mike Jordan
|
|
|
early afternoon- Matt Phone #: ###-####. Resubmit to plan review to reflect actual work.
|
BLD-Framing/Rough-in | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Mike Jordan
|
|
|
CO2 room and buffering rooms are now ok.
|
BLD-Framing/Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | FAIL |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Install the additional holdown, missing strapping and blocking.
|
BLD-Footing | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | PART |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Interior footing for new shear wall. Rebar cage was placed at and angle due to pre existting concrete under slab. Contractor to get RFI for fix or to leave as is.
|
BLD-Framing/Rough-in | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PART |
Brandon Shaw
|
|
|
Phase I, copper booth- framing- OK to cover
|
BLD-Ceiling Grid Inspection | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | PART |
Brandon Shaw
|
|
|
Phase I, A booth- ceiling grid- OK to cover
|
BLD-Footing | 10/25/2017 | 10/25/2017 | 10/25/2017 | P | CANC |
Brandon Shaw
|
|
|
interior slab - Matt Phone #: ###-####
|
BLD-Footing | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PASS |
Mike Jordan
|
|
|
Chuck Phone #: ###-####. Exterior slab on grades for new equipment pads, west side of building.
|
BLD-Framing/Rough-in | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
Mike Jordan
|
|
|
Matt-phase 1-Matt said this inspection doesn't have anything to do with the plan mod Phone #: ###-####. Interior steel stud framed walls and wood I-joist ok, phase 1.
|