BLD-Final | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Brandon Shaw
|
|
|
Bob Smith Phone #: ###-####
|
DOC - Permit Finaled | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 11/3/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Jim Storey
|
|
|
First thing please - Robert Phone #: ###-#### temp ok pending others
|
FIRE-Final Inspection | 11/3/2017 | 11/6/2017 | 11/6/2017 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete, racking permit complete, fire extinguishers are in place with current inspection tags, fire alarms will be completed at a later date (FIR17-00649, fire sprinkler system is being monitored at time of inspection). TCO for life fire safety authorized for 30 days per conversation with Scott Arellano, TCO is contingent on fire alarm inspection being completed and passed.
|
FIRE-Final Inspection | 10/25/2017 | 10/27/2017 | 10/27/2017 | P | FAIL |
Troy Cobbley
|
|
|
No city approved plans or small documents on site. No address is present. Knox box has been removed. Racking permit is not signed off yet, Contractor stated delayed egress locks are being utilized so I went over IFC requirements for delayed egress locks which includes connection with the existing fire alarm system. I also noted that the mechanical plans indicate seven duct smoke detectors to be installed. We called the mechanical installer and he stated that by using the exception in the IMC only one is required. He is going to get approval from the mechanical engineer to delete the non-required and provide to me. But the one required duct smoke detector again will need to be tied into the existing fire alarm system. I noted thumbturn dead bolts at the main exit. This was only a partial courtesy inspection since no approved documents are on site.
Smith Phone #: ###-####
|
FIRE-Final Inspection | 10/13/2017 | 10/16/2017 | 10/16/2017 | P | FAIL |
Jim Page
|
|
|
Tenant space not ready for life fire safety inspection. Racking permit needs to be inspected and passed, FIR permit for fire sprinklers needs to be in finaled status.
|
BLD-Framing/Rough-in | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Jim Storey
|
|
|
Bob Smith Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Jim Storey
|
|
|
Bob Smith Phone #: ###-####
|
BLD-Conference | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Jim Storey
|
|
|
Robert Phone #: ###-####
|
FIRE-Conference | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete. Contractor installing the storage racks is working on getting a racking permit due to storage elevation exceeding 8 feet. Noted that the project for D&B does not have a FIR permit issued for the fire sprinkler system modifications, only FIR permit issued for the space is FIR17-00203 for demo work on the old Hastings tenant. Fire sprinkler heads will need to be added around the northeast and northwest HVAC penetrations. Janitor closet in the back off of the sales floor will need to have a sprinkler head installed in the fitting provided for the fire sprinkler head. Two fire sprinkler heads on the southwest area of old entry will need to be changed to dry pendants.
|
BLD-Framing/Rough-in | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### front enrty framing ok to cover
|
BLD-Ceiling Grid Inspection | 8/10/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | PASS |
Jim Storey
|
|
|
Robert Smith Phone #: ###-####
|
FIRE-Conference | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Footing | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Jim Storey
|
|
|
Robert Phone #: ###-####
|
BLD-Footing | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | PASS |
Jim Storey
|
|
|
Rob Phone #: ###-####east end footting ok
|
BLD-Foundation | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Jim Storey
|
|
|
Rebar // Bob Phone #: ###-#### wast vestable ft ok
|