BLD-Final | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
Tony Young
|
|
|
Please process this request for building final, / occupancy release Phone #: ###-#### Inspection requested via web by Richard Glenn
|
FIRE-Final Inspection | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is mounted with a current inspection tag. Final life fire safety inspection for area of work complete.
|
FIRE-Conference | 9/20/2017 | 9/20/2017 | 9/20/2017 | P | DONE |
Troy Cobbley
|
|
|
Rick and I discussed the new double exit doors. Per Rick doors will not be installed until November and when installed will not impede exiting. Right now no doors will be installed. I'm ok with this but will need to inspect operation when installed. Fire sprinkler permit is finaled, fire alarm permit has not been inspected nor has life safety yet.
|
FIRE-Supply Line Hydro | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in. Rick Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PASS |
Tony Young
|
|
|
Rick Phone #: ###-####
|
BLD-Energy code compliance | 8/23/2017 | 8/23/2017 | 8/24/2017 | P | PASS |
Dave Hannah
|
|
|
Rick-sound insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 8/18/2017 | 8/21/2017 | 8/21/2017 | A | PART |
Brandon Shaw
|
|
|
OK to insulate
|