Permit Information
Permit NumberBLD17-01886
StatusFinaled
Name CARROLL CONSTRUCTION
Site Address 175 N 14TH ST
Project NameWater Cooler Coffee Shop
Customer Number 
ePlanReviewYes
Description
(TXIKITEO - FORMERLY SUBMITTED AS WATER COOLER COFFEE SHOP – 1ST STORY – NORTHEAST CORNER) (DRH15-00461) (CUP15-00083) (2-6-18 PLAN MODIFICATION TO DELETE ONE SINK AND A GREASE INTERCEPTOR. A WATER REFILL SINK WILL BE SWAPPED OUT FOR A NEW 12 INCH HAND SINK.) (12-19-17 PLAN MODIFICATION TO REVISE THE BAR AND THE BACK BAR AREA, TO RECONFIGURE THE PUBLIC DINING AREA INCLUDING THE SEATING LAYOUT, TO CHANGE THE BACK BAR FOOD PREPARATION EQUIPMENT, TO CONSTRUCT A RESTROOM ACCESS HALLWAY, AND TO ELIMINATE THE MECHANICAL LOFT AND THE FORMERLY PROPOSED TENANT HVAC EQUIPMENT. THE HVAC FAN COIL UNITS AND HEAT PUMP UNITS INSTALLED UNDER THE SHELL PERMIT WILL BE RE-USED WITH AN OUTSIDE AIR DUCT ATTACHED TO THE RETURN AIR SYSTEM OF EACH UNIT TO PROVIDE A TOTAL OF 300 CFM OF OUTSIDE AIR.) The NFPA 13R fire sprinkler system is used for the R-2 Occupancy. This building was constructed under permit BLD16-00473. The 2012 IBC was in effect at the time. To construct tenant improvements within an existing 846 square foot shell space for a coffee shop tenant. Work is to include interior nonbearing walls, two restrooms accessible to the disabled, interior doors, a bar, bar stools, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R (NFPA 13 for the coffee shop) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/13/20183/14/20183/14/2018PPASS
DetailsDave Hannah
Ken Phone #: ###-####
FIRE-Final Inspection3/13/20183/14/20183/14/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection complete.
FIRE-Conference3/12/20183/12/20183/12/2018ADONE
DetailsJim Page
Fire conference complete, door hardware on north exterior door will need to be changed to single action door hardware and not a double key type lock.
FIRE-Final Inspection3/9/20183/12/20183/12/2018ACANC
DetailsJim Page
Inspection request was for a conference, this request is cancelled.
BLD-Framing/Rough-in1/23/20181/24/20181/24/2018PPEND
DetailsDave Hannah
Ken Phone #: ###-#### framing looks ok but need to resubmit a new floor plan becouse of changes make to layout in t/i
BLD-Framing/Rough-in1/22/20181/23/20181/23/2018PNR
DetailsJim Storey
Ken Phone #: ###-#### need aproved plan for insp.