BLD-Final | 10/10/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells
|
DOC - Permit Finaled | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Mike Jordan
|
|
|
All isues resolved.
|
BLD-Final | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells. Cancelled by contractor via phone call.
|
BLD-Final | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells. Need plumbinbg final inspection, need blower doorr test results posted. Install bollard in garage at water heater. Corection notice posted.
|
BLD-Energy code compliance | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells
|
BLD-Energy code compliance | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells
|
BLD-Framing/Rough-in | 8/13/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells
|
BLD-Wall Bracing | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | PASS |
Mike Jordan
|
|
|
Zane Phone #: ###-####
|
BLD-Wall Bracing | 8/1/2017 | 8/2/2017 | 8/2/2017 | A | FAIL |
Mike Jordan
|
|
|
Zane Phone #: ###-####. Fasten tall wall by stairs, several areas missed. Provide more fasteners around window openings. several areas missed on west wall. Check top of wall edges and bottom of wall edges 2nd. floor, areas missed. Correction notice posted.
|
BLD-Foundation | 7/6/2017 | 7/7/2017 | 7/7/2017 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|