BLD-Aging Inspection | 8/1/2018 | 8/1/2018 | 8/1/2018 | | PEND |
Mike Jordan
|
|
|
|
BLD-Final | 6/1/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm occ. once zoning signs perm. Nocard on site to sign.
|
FIRE-Final Inspection | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by David Scaggs
|
FIRE-Final Inspection | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | FAIL |
Jim Page
|
|
|
FIR permits for fire sprinkler and fire alarm need to be finaled before life fire safety inspection can be performed.
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Energy code compliance | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Mike Jordan
|
|
|
Please accommodate a 4 o''clock inspection Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Wall Bracing | 2/28/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD-Framing/Rough-in | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PART |
Mike Jordan
|
|
|
Please accommodate a 3 o''clock inspection. Phone #: ###-#### Inspection requested via web by David Scaggs. Fire block at top of wall at mech. rooms upstairs.
|
BLD-Footing | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Mike Jordan
|
|
|
Interior footings, concrete is scheduled for 9am Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD-Footing | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | NR |
Mike Jordan
|
|
|
Interior footings Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD-Energy code compliance | 1/1/2018 | 1/2/2018 | 1/2/2018 | A | PART |
Mike Jordan
|
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by Marty Short. Noted to contractor that prior to backfill operations, areas to be backfilled must be free of snow and ice and not be frozen. Baclfill materials also to not be frozen.
|
BLD-Foundation | 12/26/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Mike Jordan
|
|
|
Concrete scheduled for 1pm Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD-Footing | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Mike Jordan
|
|
|
Concrete scheduled for 2pm Phone #: ###-#### Inspection requested via web by Marty Short
|