Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD17-02418
StatusFinaled
Name SUMMIT DEVELOPMENT INC
Site Address 1279 S BIRD ST
Project NameCimarron Apartments
Customer NumberBLD17-02410 - BLD17-02429
ePlanReviewNo
Description
(CIMARRON APARTMENTS 4-PLEX) (20 PERMITS FILED UNDER BLD17-02410 IN EPLANREVIEW)(DRH17-00144) **Permit for the construction of a 20 multi-family buildings consisting of 80 units total in (1) six-plex, (1) duplex, and (18) four-plexes. All buildings are reviewed under the IBC and are required to be fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/1/20188/1/20188/1/2018 PEND
DetailsMike Jordan
BLD-Final6/1/20186/1/20186/1/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm occ. once zoning signs perm. Nocard on site to sign.
FIRE-Final Inspection5/18/20185/18/20185/18/2018PPASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by David Scaggs
FIRE-Final Inspection5/16/20185/16/20185/16/2018PFAIL
DetailsJim Page
FIR permits for fire sprinkler and fire alarm need to be finaled before life fire safety inspection can be performed.

Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Energy code compliance2/28/20182/28/20182/28/2018PPASS
DetailsMike Jordan
Please accommodate a 4 o''clock inspection Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Wall Bracing2/28/20182/28/20182/28/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Framing/Rough-in2/26/20182/26/20182/26/2018PPART
DetailsMike Jordan
Please accommodate a 3 o''clock inspection. Phone #: ###-#### Inspection requested via web by David Scaggs. Fire block at top of wall at mech. rooms upstairs.
BLD-Footing1/8/20181/9/20181/9/2018APASS
DetailsMike Jordan
Interior footings, concrete is scheduled for 9am Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Footing1/8/20181/8/20181/8/2018PNR
DetailsMike Jordan
Interior footings Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Energy code compliance1/1/20181/2/20181/2/2018APART
DetailsMike Jordan
Foundation insulation Phone #: ###-#### Inspection requested via web by Marty Short. Noted to contractor that prior to backfill operations, areas to be backfilled must be free of snow and ice and not be frozen. Baclfill materials also to not be frozen.
BLD-Foundation12/26/201712/27/201712/27/2017PPASS
DetailsMike Jordan
Concrete scheduled for 1pm Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Footing12/14/201712/14/201712/14/2017PPASS
DetailsMike Jordan
Concrete scheduled for 2pm Phone #: ###-#### Inspection requested via web by Marty Short