BLD-Final | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Mike Jordan
|
|
|
Building shell final, plumbers are calling in to close out their permits this morning. Thank you Michael McHargue Phone #: ###-#### Inspection requested via web by Michael McHargue
|
DOC - Permit Finaled | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Adam Joslin
|
BLD-Wall Bracing | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Mike Jordan
|
|
|
shear // Adam Phone #: ###-####. All issues have been corrected.
|
BLD-Wall Bracing | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | FAIL |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Shear wall type 2 needs either 8d nails or 15 guage staples for atachment min. Appears that 16 guage was used.
|
BLD-Other | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Mike Jordan
|
|
|
roof shear // Adam Phone #: ###-####. Roof diaprtagm nailing and hardware ok.
|
BLD-Other | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | CANC |
Mike Jordan
|
|
|
Alex-roof drain Phone #: ###-####
|
BLD-Foundation | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | CANC |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Energy code compliance | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Rigid insulation at interior side of stemwall ok.
|
BLD-Foundation | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 6/8/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 6/7/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|