BLD-Final | 6/26/2018 | 6/28/2018 | 7/3/2018 | P | PASS |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
DOC - Permit Finaled | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/15/2018 | 6/15/2018 | 6/15/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/14/2018 | 6/14/2018 | 6/15/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 1/30/2018 | 1/31/2018 | 1/31/2018 | P | PART |
Tony Young
|
|
|
Basement - Dusty Phone #: ###-####,, basement area cleaned up and added a couple walls to utilize the area for storage only,, non- habitable area,, mechanical rooms ,, ok to sheet rock walls and ceiling to cover old burned/charred area
|
BLD-Wall Bracing | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Tony Young
|
|
|
shear wall- Peter Phone #: ###-####
|
BLD-Foundation | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | DONE |
Tony Young
|
|
|
Garage- Zach Phone #: ###-####
|
BLD-Conference | 1/9/2018 | 1/10/2018 | 1/10/2018 | A | PASS |
Tony Young
|
|
|
Garage- Zach Phone #: ###-####,, moved back to 12' off of the east side,, repoured the footing on east
|
BLD-Conference | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | DEFR |
Tony Young
|
|
|
Garage- Zach Phone #: ###-####
|
BLD-Footing | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PART |
Tony Young
|
|
|
Garage- Zach Phone #: ###-####,, will re-pour the west footing to go back to the original garage size
|
BLD-Footing | 1/4/2018 | 1/8/2018 | 1/8/2018 | A | PART |
Tony Young
|
|
|
Garage- Zach Phone #: ###-####,, owner will go into office to see if he can have a 14' wide garage,, setbacks appear ok on the west side at 5' ,, ok to pour either way at owners risk
|
BLD-Framing/Rough-in | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-#### ok to cover upstairs ridge to beam connection ok
|
BLD-Conference | 11/29/2017 | 11/30/2017 | 12/14/2017 | A | PEND |
Dave Hannah
|
|
|
Zach Phone #: ###-#### still needs to fix ridge to beam connection
|
BLD-Energy code compliance | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | PASS |
Tony Young
|
|
|
Zach Phone #: ###-####,, work in progress on fire blocking,, ok
|
BLD-Footing | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Tony Young
|
|
|
Zach Phone #: ###-####,, 2 point load footings in basement floor for upper beam loads
|
BLD-Framing/Rough-in | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, work in progress on fixes,, adding point loads, adding fire blocks etc..
|
BLD-Conference | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, ok to cover upper porch area
|
BLD-Framing/Rough-in | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | NR |
Tony Young
|
|
|
Zach Phone #: ###-####,, walk through with 425,, needs to finish interior footings,, interior framing, adding headers, etc.
|
BLD-Framing/Rough-in | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | FAIL |
Dave Hannah
|
|
|
call to meet // zack Phone #: ###-#### need engineering on up stairs vulted ceiling. need to see engineering on fire damage. need concrete peir pads poured and point loads transfred need draft stopping and fire blocking ok to insulate ext walls
|