BLD-Final | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Douglas Lyman
|
DOC - Permit Finaled | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Douglas Lyman
|
BLD-Footing | 9/27/2017 | 9/28/2017 | 9/29/2017 | P | PASS |
Brandon Shaw
|
|
|
Footing inspection prior to concrete for patio cover. Please text or call 30 minutes prior to inspector arrival so I can meet inspector at the job site, I will be about 30 minutes from job site. Thanks, Doug Phone #: ###-#### Inspection requested via web by Douglas Lyman
|