BLD-Final | 6/28/2018 | 7/2/2018 | 7/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/28/2018 | 7/2/2018 | 7/2/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.3
|
BLD-Energy code compliance | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | PEND |
Brandon Shaw
|
|
|
1) FO1 truss to be fastened per Engineering 2) 2x6 ledger to be fastened with 3 16d nails @ each stud OK to insulate
|
BLD-Other | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Ever----soffit inspection Phone #: ###-####
|
BLD-Wall Bracing | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Brandon Shaw
|
|
|
Aver (?) Phone #: ###-####
|
BLD-Footing | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Brandon Shaw
|
|
|
JR Phone #: ###-####
|