BLD-Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PASS |
Jim Storey
|
|
|
Kent Phone #: ###-#### no card on site
|
FIRE-Final Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
|
FIRE-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PART |
Jim Page
|
|
|
Partial final inspection complete, no fire sprinklers, no fire alarm modifications, fire extinguishers are in place with current inspection tags, box needs to be built for roll up door for heat collection on fusible link, life fire safety can be finaled when box is complete.
|
BLD-Conference | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
|
FIRE-Final Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | FAIL |
Troy Cobbley
|
|
|
Repair exit sign, provide emergency light, provide additional fire extinguisher, provide installation and testing of the fire door that meets NFPA 80, exit sign leads people to the fire door so this needs approved by the plan reviewer.
Kent Phone #: ###-####
|
BLD-Final | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | NR |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/5/2018 | 3/5/2018 | 3/6/2018 | P | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 12/28/2017 | 12/28/2017 | 12/29/2017 | P | PEND |
Dave Hannah
|
|
|
Kent Phone #: ###-#### ok after elec rough in
|