BLD-Final | 12/4/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | P | PART |
Brandon Shaw
|
|
|
First floor
Work in Progress
|
BLD-Wall cover | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Dave Hannah
|
|
|
I have the electrical rough in also scheduled for this afternoon. If he signs off the electrical I will be ready for wall cover. Please call so I can meet you there. Thanks Shawn Phone #: ###-#### Inspection requested via web by Shawn Dulin
|
BLD-Wall cover | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | CANC |
Dave Hannah
|
|
|
Please call prior to heading over so I can meet you there.
Thanks Shawn Phone #: ###-#### >> Inspection requested via web by Shawn Dulin
|