BLD-Final | 6/22/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/26/2018 | 6/26/2018 | 6/26/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 5.4
|
BLD-Blower Door Test Results | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall Need F/P final before going out for structural final....re-call.
|
BLD-Final | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Energy code compliance | 4/12/2018 | 4/16/2018 | 4/16/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/9/2018 | 4/12/2018 | 4/12/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 3/15/2018 | 3/16/2018 | 3/16/2018 | A | PASS |
Brandon Shaw
|
|
|
Guillermo Phone #: ###-####
|
BLD-Foundation | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 1/3/2018 | 1/4/2018 | 1/4/2018 | P | CANC |
Brandon Shaw
|
|
|
Pat Phone #: ###-####
|