BLD-Final | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Sly
|
|
|
Jake- please give call 20 min prior, he is not available between 11-12. Phone #: ###-#### OK for Temp. Occ. OK for Perm. Occ. when........Plumbing signs off Perm, and Locksets on office and storage room doors are changed out. (3). 5-14-19-as per Jim Sly ok to change PART to Final
|
BLD-Final | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | NH |
Jim Sly
|
|
|
Jake-call 20 minutes prior to meet Phone #: ###-#### Called twice.....Busy signal.......left Note on door. No access........
|
FIRE-Final Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to provide single action hardware on the Office door, door that isolates Storage area and the exterior exit door from the Storage area prior to a building inspection as per discussion.
after 130....please call 20 mins before // jake Phone #: ###-####
|
FIRE-Final Inspection | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide review comments, provide exit discharge lights at the two exits, the pizza oven must fit under the hood by 6" as per mechanical code, provide single action (lever type) hardware for doors 103A and 102A, remove both dead bolts at the main exit doors, provide panic hardware and exit light, exit sign, exit discharge light at door 106A or provide plan review approval of alternate (plans show area as a "M" but is currently being used as an "S").
Jake-please call 20 minutes prior to meet for access Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/10/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Sly
|
|
|
Jake-pleae call 20 minutes prior to meet Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | NR |
Dave Hannah
|
|
|
Jake-please call 30 mintues prior to meet Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2018 | 4/25/2018 | 4/26/2018 | P | PART |
Jim Sly
|
|
|
Jake Phone #: ###-#### Select walls
|