BLD-Final | 9/13/2018 | 9/14/2018 | 9/14/2018 | P | PASS |
Brandon Shaw
|
|
|
C of O please. Phone #: ###-#### Inspection requested via web by Will Hill
|
DOC - Permit Finaled | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 6.2
|
BLD-Energy code compliance | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD-Framing/Rough-in | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD-Framing/Rough-in | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PEND |
Brandon Shaw
|
|
|
1) 1hr rated assembly to extend 4' from property line, all soffits and eaves 2) Fire block/draft stop between floor/ceiling assemblies Typical all unuts 3) Revised Engineering/Fix for D3 truss
|
BLD-Wall Bracing | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress Thrid floor shear to be done at framing
|
BLD-Conference | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | DONE |
Brandon Shaw
|
|
|
New framers, would like to have on-site discussion about Sheetrock fire wall- Horizontal and vertical seams to be staggard 16"
|
BLD-Foundation | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|