BLD-Final | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Mike Jordan
|
|
|
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
DOC - Permit Finaled | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Mike Jordan
|
|
|
Issues have been resolved.
|
BLD-Final | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | DONE |
Mike Jordan
|
|
|
Door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide code compliant landing ?stepa from back slider to patio. Correction notice posted.
|
BLD-Blower Door Test Results | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | DONE |
Mike Jordan
|
|
|
Door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle.
3.27
|
BLD-Energy code compliance | 3/19/2018 | 3/19/2018 | 3/19/2018 | A | PASS |
Mike Jordan
|
|
|
Please schedule early AM if possible. Thanks Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 3/16/2018 | 3/16/2018 | 3/16/2018 | A | PASS |
Mike Jordan
|
|
|
I am also having fire place inspected this morning. We have correction done. Please schedule for latter in the morning if you can. Thanks Phone #: ###-#### Inspection requested via web by Joel Hirtle. ok to insulate.
|
BLD-Framing/Rough-in | 3/14/2018 | 3/15/2018 | 3/15/2018 | P | FAIL |
Brandon Shaw
|
|
|
Fire blocking at Fireplace chase Need truss Engineering
|
BLD-Framing/Rough-in | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | CANC |
Mike Jordan
|
|
|
Please schedule for latter PM, hvac inspection is happening in the AM.
Thanks Phone #: ###-#### Inspection requested via web by Joel Hirtle. Cancelled by contractor via phone call.
|
BLD-Framing/Rough-in | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Mech. rough in inspection has failed.
|
BLD-Framing/Rough-in | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech. rough in inspection.
|
BLD-Wall Bracing | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Foundation | 1/24/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 1/23/2018 | 1/24/2018 | 1/24/2018 | P | NR |
Brandon Shaw
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/22/2018 | 1/23/2018 | 1/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/19/2018 | 1/22/2018 | 1/22/2018 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Cancelled per contractor via phone call.
|
BLD-Footing | 1/18/2018 | 1/19/2018 | 1/19/2018 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/17/2018 | 1/18/2018 | 1/18/2018 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Cancelled b y contractor via phone call.
|