BLD-Final | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Mike Jordan
|
|
|
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
DOC - Permit Finaled | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | DONE |
Mike Jordan
|
|
|
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle.
4.5ACH@50pca
|
BLD-Final | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | NR |
Mike Jordan
|
|
|
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Still needs plumbing final. It has failed.
|
BLD-Final | 7/2/2018 | 7/2/2018 | 7/2/2018 | A | CANC |
Mike Jordan
|
|
|
garage door code is 2468 Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
|
BLD-Final | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | FAIL |
Mike Jordan
|
|
|
Door Cade is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Need plumbing and mech. finals. Need blower door test results and post. Clean construction debries from crawl space. Complete fire caulking in garage and 1/2 inch sheet rock above water heater. Correction notice posted.
|
BLD-Energy code compliance | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | FAIL |
Mike Jordan
|
|
|
Correct truss engineering is on site they had sent me wrong engineering. Please give me a call and I can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete lateral bracing on A1, A6, B2, B3 and B4 trusses. Remove and replace studs from under E3 2 play at exterior wall.
|
BLD-Framing/Rough-in | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete airseal prior to framing inspection.
|
BLD-Framing/Rough-in | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle., No access due to fresh conc. Needs electrical rough in inspection.
|
BLD-Wall Bracing | 3/23/2018 | 3/23/2018 | 3/23/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Wall Bracing | 3/20/2018 | 3/22/2018 | 3/22/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Foundation | 1/26/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PEND |
Brandon Shaw
|
|
|
No plans on site, pour at own risk
|
BLD-Footing | 1/23/2018 | 1/24/2018 | 1/24/2018 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/22/2018 | 1/23/2018 | 1/23/2018 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/19/2018 | 1/22/2018 | 1/22/2018 | P | CANC |
Jim Sly
|
|
|
Dane Phone #: ###-####
|