Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD17-04377
StatusFinaled
Name CBH HOMES
Site Address 7102 W COHO DR
Project NameMonterey 1-3 Fork South
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2,100 sq. ft., one story single family dwelling with 4 bedrooms, 2 bathrooms, approximately 131 sq. ft. of covered patio/porch and a 659 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/13/20187/13/20187/13/2018PPASS
DetailsMike Jordan
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled7/13/20187/13/20187/13/2018PPASS
DetailsMike Jordan
BLD-Blower Door Test Results7/13/20187/13/20187/13/2018PDONE
DetailsMike Jordan
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle.

4.5ACH@50pca
BLD-Final7/9/20187/9/20187/9/2018PNR
DetailsMike Jordan
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Still needs plumbing final. It has failed.
BLD-Final7/2/20187/2/20187/2/2018ACANC
DetailsMike Jordan
garage door code is 2468 Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Final6/20/20186/20/20186/20/2018PFAIL
DetailsMike Jordan
Door Cade is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Need plumbing and mech. finals. Need blower door test results and post. Clean construction debries from crawl space. Complete fire caulking in garage and 1/2 inch sheet rock above water heater. Correction notice posted.
BLD-Energy code compliance4/17/20184/18/20184/18/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in4/17/20184/18/20184/18/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in4/17/20184/17/20184/17/2018PFAIL
DetailsMike Jordan
Correct truss engineering is on site they had sent me wrong engineering. Please give me a call and I can meet you there.
Thanks Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete lateral bracing on A1, A6, B2, B3 and B4 trusses. Remove and replace studs from under E3 2 play at exterior wall.
BLD-Framing/Rough-in4/16/20184/16/20184/16/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in4/12/20184/13/20184/13/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in4/12/20184/12/20184/12/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete airseal prior to framing inspection.
BLD-Framing/Rough-in4/9/20184/9/20184/9/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle., No access due to fresh conc. Needs electrical rough in inspection.
BLD-Wall Bracing3/23/20183/23/20183/23/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Wall Bracing3/20/20183/22/20183/22/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation1/26/20181/29/20181/29/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing1/25/20181/26/20181/26/2018PPEND
DetailsBrandon Shaw
No plans on site, pour at own risk
BLD-Footing1/23/20181/24/20181/24/2018PCANC
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing1/22/20181/23/20181/23/2018PCANC
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing1/19/20181/22/20181/22/2018PCANC
DetailsJim Sly
Dane Phone #: ###-####