BLD-Final | 7/8/2019 | 7/8/2019 | 7/9/2019 | P | PASS |
Dave Hannah
|
|
|
Pending Elevation certs. Certs have been sent to Jason Tayler via email. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Final | 6/3/2019 | 6/5/2019 | 6/5/2019 | P | PEND |
Dave Hannah
|
|
|
Final Building Occ Centennial Plaza Temp Occ Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok aftewr elec final
|
BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 | A | PART |
Dave Hannah
|
|
|
Temp Occ Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok to load cages
|
BLD-Final | 3/1/2019 | 3/4/2019 | 3/5/2019 | P | CANC |
Dave Hannah
|
|
|
Temp Occ Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIRE-Final Inspection | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Permit numbers at the bottom of the page dont match because all drawings were submitted in a set. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIRE-Final Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | CANC |
Jim Page
|
|
|
Rescheduled per conversation with point of contact.
Brandon Phone #: ###-####
|
BLD-Final | 3/1/2019 | 3/1/2019 | 3/1/2019 | P | CANC |
Dave Hannah
|
|
|
Looking for Temp Occupency Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Final | 2/26/2019 | 3/1/2019 | 3/1/2019 | P | CANC |
Dave Hannah
|
|
|
No option for fire life safety, call with questions. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Final | 2/26/2019 | 2/27/2019 | 2/26/2019 | P | CANC |
Dave Hannah
|
|
|
No option for fire life safety final. Call with questions Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Framing/Rough-in | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Dave Hannah
|
|
|
Roddy Phone #: ###-####
|
BLD-Foundation | 9/27/2018 | 10/1/2018 | 10/1/2018 | A | PEND |
Dave Hannah
|
|
|
We need a grout/rebar inspection on building C4 Monday morning. Grout scheduled for 1pm. Phone #: ###-#### Inspection requested via web by Justin Palm ok after spec inspection
|
BLD-Footing | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Dave Hannah
|
|
|
Rebar at CMU walls C4 gibbon exhibit. Grouting in afternoon. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Foundation | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | CANC |
Dave Hannah
|
|
|
Masonry Rebar inspection for C5 in Centennial site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD-Footing | 8/7/2018 | 8/8/2018 | 8/9/2018 | P | PASS |
Dave Hannah
|
|
|
There will be a footing pour the following day, Thursday, at 5am. Inspection can be as late as 3:30pm on Wednesday the 8th. Phone #: ###-#### Inspection requested via web by Justin Palm
|
BLD-Concrete | 8/7/2018 | 8/9/2018 | 8/7/2018 | A | CANC |
Dave Hannah
|
|
|
Column footing to be poured early morning. Expecting mud at 5am. There is an additional footing pour happening on site, same day/same time, different building and permit number. I will put in for an individual inspection, just know its all on the same job site. Number listed is for Savannah, she will be on site. Phone #: ###-#### >> Inspection requested via web by Justin Palm Inspection cancelled from web by: Justin Palm
|
BLD-Foundation | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Dave Hannah
|
|
|
Stem wall pour. Concrete is scheduled for noon via Brundage Bone pump. MTI will be on site to inspect rebar and concrete. Phone #: ###-#### Inspection requested via web by Justin Palm
|
BLD-Footing | 7/19/2018 | 7/20/2018 | 7/23/2018 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Palm
|
BLD-Concrete | 8/22/2018 | 8/23/2018 | | A | |
Dave Hannah
|
|
|
Need a rebar inspection for slab on grade. Size of the slab is approximately 10''x17'' >> Inspection requested via web by Justin Palm
|