BLD-Final | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
DOC - Permit Finaled | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates. Everything ok. Needs mech final.
|
BLD-Energy code compliance | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Energy code compliance | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates. All corrections have not yet been made. Still needs ti install anchor bolts, Install laeral bracing on B06 truss and the additional stud at double top plate breal is non bearing.
|
BLD-Framing/Rough-in | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | FAIL |
Mike Jordan
|
|
|
Conplete lateral bracingon B03 and B06 trusses. Roll block B01 and A01 trusses at raised heel. Install additional studs at 5.5x9 GLB east end. Instal the 1/2 inch anchor bolts at thickend footing in garage. Provide addtional stud at double top plate break, east wall in kitchen. Justify the 2 inch holedrilled through the 5.5x9 GLB. Correction notice issued. Ok to insulate.
|
BLD-Framing/Rough-in | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | CANC |
Mike Jordan
|
|
|
New truss layout will be in home in packet and on wall. Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates. Provided truss engineering does not match, no lay out provided.
|
BLD-Wall Bracing | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Dave Hannah
|
|
|
Louis Phone #: ###-####
|
BLD-Wall Bracing | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | FAIL |
Mike Jordan
|
|
|
Louise Phone #: ###-####. Fasteners spaced to far apart, sheating cut to short, edges not in contact with blocking.
|
BLD-Foundation | 1/9/2018 | 1/10/2018 | 1/10/2018 | A | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|