BLD-Framing/Rough-in | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | DONE |
Jim Storey
|
|
|
Peter Phone #: ###-####
|
BLD-Final | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Jim Storey
|
|
|
Peter Phone #: ###-####
|
FIRE-Final Inspection | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection complete.
Peter Phone #: ###-####
|
FIRE-Final Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | FAIL |
Jim Page
|
|
|
Provide emergency exit discharge illuminatoin as stated in note number 7 of the building permit fire code review comments. Northeast exit door swings the wrong direction, swing is not with the path of travel, city approved drawings show door swinging with the exit path of travel.
7###-#### Kai
|
BLD-Final | 2/28/2019 | 2/28/2019 | 2/28/2019 | P | NR |
Jim Storey
|
|
|
Kai Phone #: ###-#### lost card need hardware single function// health and fire sign offs.
|
BLD-Aging Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PASS |
Jim Storey
|
|
|
fransico Phone #: ###-####
|
BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | FAIL |
Jim Storey
|
|
|
Franciso Phone #: ###-#### need ada backing
|