BLD-Final | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
DOC - Permit Finaled | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/11/2018 | 10/11/2018 | 10/11/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 5.3
|
BLD-Energy code compliance | 8/7/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Framing/Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PEND |
Brandon Shaw
|
|
|
Provide engineering fix for broken A3 truss
OK to insulate
|
BLD-Wall Bracing | 6/20/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Brandon Shaw
|
|
|
shear- Guillem Phone #: ###-####
|
BLD-Foundation | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|