Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD17-04682
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 850 W MAIN ST
Project NameLBH Tenant Improvement
Customer NumberBLD18-00735 INTERIOR DEMO
ePlanReviewYes
Description
(LBH [LES BOIS HOLDINGS] OFFICE – TENANT IMPROVEMENT) This building does not have a fire sprinkler system. Interior demolition work, including entirely removing the mezzanine, was done under permit BLD18-00735. To construct a 1,270 square foot 2nd story within an existing tenant space that has a 1st story floor area of about 2,567 square feet. Structural work includes concrete footings, steel columns with steel base plates and anchors, steel beams, lightweight concrete floor over a steel deck, steel stair stringers, and precast concrete stair treads. Special Inspection is required for soils, welding, bolting, intumescent fire-resistant coatings, and anchors post-installed in hardened concrete. Other work includes interior nonbearing walls, a new toilet room accessible to the disabled, an existing toilet room upgraded to be accessible to the disabled, interior windows, interior doors, interior guards, removing the existing East exterior door at Main Street and replacing it with a low wall and storefront window to match the adjacent construction, and interior finishes. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a Certificate of Occupancy for this tenant. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/6/20189/7/20189/7/2018APASS
DetailsJim Sly
Nicol Phone #: ###-####
FIRE-Final Inspection9/5/20189/6/20189/6/2018APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers will be placed in discussed locations, addressing and main entry panic hardware to be installed before final BLD inspection as discussed. Final life fire safety inspection complete.

mid AM requested // Nicol Phone #: ###-####
BLD-Conference9/5/20189/5/20189/5/2018PDONE
DetailsDave Hannah
Nicol Phone #: ###-####
BLD-Energy code compliance8/1/20188/2/20188/2/2018APASS
DetailsDave Hannah
Nickel Phone #: ###-####
BLD-Framing/Rough-in7/31/20187/31/20187/31/2018PPASS
DetailsDave Hannah
Nicol Phone #: ###-####
BLD-Other7/30/20187/31/20187/31/2018APASS
DetailsDave Hannah
Pouring concrete structual // Nicol Phone #: ###-####
BLD-Other6/13/20186/13/20186/13/2018PPASS
DetailsDave Hannah
Nickel-pouring concrete on the 2nd flour of the decking Phone #: ###-####