Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD18-00002
StatusFinaled
Name IDAHO TOWER CONSTRUCTION CO
Site Address 318 S VISTA AVE
Project NameVerizon Wireless
Customer Number 
ePlanReviewYes
Description
(VERIZON WIRELESS – BOI TRAIN DEPOT) Permit for the modifications to the existing cellular monopine tower with work to include the removal of (6) panel antennas, relocation of (3) 700 RRH units, relocation of (3) AWS RRH units, relocation of (3) PCS RRH units, relocation of (2) MOVP units, adding (6) 8-foot Commscope JAHH-65C-R3B panel antennas, adding (3) 850 RRH units, adding (6) back to back antenna mounts, adding (1) pipe antennas mount, @ ground equipment shelter removing (1) BBU/OVP/CPRI rack, adding (1) Raycap rack and stack. No changes to the height of the tower and minor equipment modification to interior of existing equipment structure. Structural engineering and plans provided. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/31/20187/31/20187/31/2018PPASS
DetailsJim Storey
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne
DOC - Permit Finaled7/31/20187/31/20187/31/2018PPASS
DetailsJim Storey