BLD-Final | 9/13/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Tell Riley
|
|
|
Andy Phone #: ###-####//final complete//
|
FIRE-Final Inspection | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####. The project related fire sprinkler permit has been finaled.
|
FIRE-Final Inspection | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PART |
Troy Cobbley
|
|
|
Life safety temp until the project related fire sprinkler system is finaled.
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//window fall protection added//occupancy ok for 1 week in conjunction with fire life safety//after fire signs off-occupancy ok//
|
BLD-Final | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | FAIL |
Tell Riley
|
|
|
please call 1st Phone #: ###-#### Inspection requested via web by Andy Thompson//add window fall prtection devices per plans//
|
FIRE-Final Inspection | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PART |
Troy Cobbley
|
|
|
A temporary for this permit is being given for one week. Work that needs completed is: cover the cpvc piping in the riser rooms and in the storage closets, provide one hour riser room, provide heat in the riser room, move smoke alarms.
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
FIRE-Conference | 8/4/2019 | 8/5/2019 | 8/5/2019 | A | DONE |
Troy Cobbley
|
|
|
Andy and I discussed boxing in the exposed piping in the closets, filling with insulation but no insulation on the interior wall side. Also the outer layer of sheet rock on the adjoining wall would be cut out to facilitate the transfer of heat from the interior. We also discussed riser room signage and placement of the interior smokd alarms. call to confirm please! Troy knows what I''m talking about. Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Final | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | NR |
Tell Riley
|
|
|
Please call to schedule Phone #: ###-#### Inspection requested via web by Andy Thompson//need final fire sprinkler inspection, life safety inspection//have plans onsite for final//
|
BLD-Aging Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | | PASS |
Tell Riley
|
|
|
recently performed inspection on canopy in park area//dwelling units are still under construction//
|
BLD-Energy code compliance | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested v OK to rock except areas around bath fans.....2nd floor.........after sprinkler inspection. Talked to Andy about this.
|
BLD-Framing/Rough-in | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson All OK except....Part on HVAC......Need to verify bath fans are listed....Rated 1hr for ceiling
|
BLD-Framing/Rough-in | 2/19/2019 | 2/19/2019 | 2/20/2019 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 2/16/2019 | 2/19/2019 | 2/19/2019 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson Need Mech R/I
|
BLD-Conference | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Wall Bracing | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Wall Bracing | 12/11/2018 | 12/12/2018 | 12/12/2018 | P | NR |
Jim Sly
|
|
|
please call 20-30 min in advance so builder can meet on site. Thank you! Phone #: ###-#### Inspection requested via web by Andy Thompson Used staples in lieu of nails as shown on approved plan.
|
BLD-Foundation | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Footing | 11/4/2018 | 11/5/2018 | 11/5/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|