BLD-Final | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | PASS |
Mike Jordan
|
|
|
Antonio Phone #: ###-####
|
DOC - Permit Finaled | 2/12/2018 | 2/12/2018 | 2/12/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/8/2018 | 2/9/2018 | 2/9/2018 | P | NR |
Mike Jordan
|
|
|
Antonio Phone #: ###-####
|
FIRE-Final Inspection | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor agreed to change out the round knobs on the doors to lever (single action) type as per the Door Hardware Schedule on the approved plans. This needs to be done prior to a building inspection.
Santonio Phone #: ###-####
|
BLD-Final | 2/6/2018 | 2/8/2018 | 2/8/2018 | A | NR |
Mike Jordan
|
|
|
call half hour before // Antonio Phone #: ###-####. Needs fire/life/safety final and plumbing permit.
|
BLD-Framing/Rough-in | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | PASS |
Jim Sly
|
|
|
Late afternoon // Antonio Phone #: ###-####
|
BLD-Framing/Rough-in | 1/22/2018 | 1/23/2018 | 1/23/2018 | A | FAIL |
Mike Jordan
|
|
|
Antonio Phone #: ###-####. Remove screws from top track tto grid, and install the kickers as shown on the approved plans.
|