BLD-Blower Door Test Results | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | DONE |
Mike Jordan
|
|
|
4.9
|
BLD-Final | 5/15/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
DOC - Permit Finaled | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/14/2018 | 5/15/2018 | 5/15/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Philip Yates Inspection cancelled from web by: Philip Yates
|
BLD-Energy code compliance | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections- SAT
|
BLD-Framing/Rough-in | 3/19/2018 | 3/20/2018 | 3/20/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates. Complete lateral bracing on A02, A03 and A04 trusses. Nail 2ply BG01 box truss per the engineering. Roll block floor joist at cantilevers. Provide 2x6 blocking under either end of BGO1 truss to complte load path. Install the additional SDS screws on ledgers. ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PASS |
Jim Sly
|
|
|
Louis Phone #: ###-####
|
BLD-Foundation | 1/28/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|