BLD-Final | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
DOC - Permit Finaled | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
Scott Phone #: ###-####
|
BLD-Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C of O has been OK'd...
|
FIRE-Final Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 | A | PART |
Jim Page
|
|
|
TCO for fire life safety approved per conversation with Ron Johnson for 30 days for vendor/employee training only. Once fire alarm permit is finaled then life fire safety can be signed off as finaled.
Schedule to come at the same time as the Fire Alarm inspection. Thanks Phone #: ###-#### Inspection requested via web by JT Turner
|
FIRE-Final Inspection | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | CANC |
Troy Cobbley
|
|
|
Need the project related FIR permits scheduled and finaled prior to a life safety inspection.
Phone #: ###-#### Inspection requested via web by JT Turner
|
FIRE-Final Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | FAIL |
Jim Page
|
|
|
FIR permits for fire alarm, fire alarm communicator and hood suppression system needs to be completed and finaled before life fire safety inspection can be completed.
Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Truss repairs in area B inspection.
|
BLD-Framing/Rough-in | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PART |
Brandon Shaw
|
|
|
West side of common areas truss repairs for cover inspection.
|
BLD-Framing/Rough-in | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | PART |
Brandon Shaw
|
|
|
Area A Exterior wall inspections for insulation cover.
|
BLD-Wall cover | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PART |
Brandon Shaw
|
|
|
Area D walls in East Corridors for cover.
|
BLD-Framing/Rough-in | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PART |
Brandon Shaw
|
|
|
Area D corridors- Hat channel and insulation, OK to cover
|
BLD-Energy code compliance | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | PART |
Brandon Shaw
|
|
|
West side of Area D Green board/Fire tape inspection.
|
BLD-Footing | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Entry Drive through Canopy footings rebar inspection.
|
BLD-Framing/Rough-in | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PART |
Brandon Shaw
|
|
|
Roof and wall sheathing , building A & B
Exterior only framing, building C& D OK to insulate
|
BLD-Framing/Rough-in | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PART |
Brandon Shaw
|
|
|
Roof Sheeting inspection area C.
|
BLD-Framing/Rough-in | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PART |
Brandon Shaw
|
|
|
Roof strap and nailing inspection. Area D Exterior and roof, wall bracing, done.
|
BLD-Framing/Rough-in | 6/29/2018 | 7/3/2018 | 7/3/2018 | A | PART |
Brandon Shaw
|
|
|
Exterior Sheathing. Assisted Living wing Partial, courtyard C
|
BLD-Framing/Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 | P | PART |
Brandon Shaw
|
|
|
BLD D, courtyard- shear nailing
|
BLD-Framing/Rough-in | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PART |
Jim Sly
|
|
|
Partial Nailing inspection on exterior plywood for waterproofing cover. North west corner of Assisted living wing. Phone #: ###-#### Inspection requested via web by JT Turner Ext Shear nailing .....Only. 2/3 section of North wall (East end) and East wall....down to Electrical room.......OK.
|