BLD-Final | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
DOC - Permit Finaled | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Lierman
|
BLD-Energy code compliance | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Jim Storey
|
|
|
Earlier the better Phone #: ###-#### Inspection requested via web by Ryan Lierman
|
BLD-Framing/Rough-in | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Lierman hvac cut bearring studs 1st and 2nd floors/ fur out and fire blk ceilling 2nd floor.
|
BLD-Wall Bracing | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Lierman
|
BLD-Footing | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PASS |
Jim Storey
|
|
|
Will be ready at 3pm. Giber Perez ###-#### Phone #: ###-#### Inspection requested via web by Ryan Lierman
|