BLD-Final | 10/29/2018 | 10/29/2018 | 10/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Blower Door Test Results | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.8
|
DOC - Permit Finaled | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 8/24/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PART |
Brandon Shaw
|
|
|
Per plans, 1/2" anchor bolts to be secured- 2"x2" washers and nuts Add missing anchor bolts to ends of sill plates See red paint OK to insulate
|
BLD-Framing/Rough-in | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Wall Bracing | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Brandon Shaw
|
|
|
Miguel Phone #: ###-####
|
BLD-Wall cover | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | CANC |
Brandon Shaw
|
|
|
Migel Phone #: ###-####
|
BLD-Conference | 4/23/2018 | 4/23/2018 | 4/23/2018 | A | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Foundation | 4/23/2018 | 4/23/2018 | 4/23/2018 | A | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|