DOC - Permit Finaled | | | 6/19/2018 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 6/18/2018 | | DONE |
|
|
|
passed final 6/14/18
|
BLD-Final | 6/13/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####
|
FIRE-Final Inspection | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | DONE |
Tony Young
|
|
|
Eric Phone #: ###-####,, 2nd floor ceiling
|
BLD-Final | 4/23/2018 | 4/24/2018 | 4/25/2018 | P | PART |
Dave Hannah
|
|
|
Eric Phone #: ###-####,, late am after F/L/S ok to occ 1rst floor
|
FIRE-Final Inspection | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | PART |
Jim Page
|
|
|
Final life fire safety inspection complete for level 1. Eric Phone #: ###-####
|
BLD-Final | 4/20/2018 | 4/23/2018 | 4/23/2018 | P | CANC |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/5/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-#### -chgd from morning to afternoon appt, due to electrical not being ready 1st floor ok to flood
|
BLD-Framing/Rough-in | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|