BLD-Final | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Mike Jordan
|
|
|
Mike- if possible closer to 3pm Phone #: ###-####
|
DOC - Permit Finaled | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Will verify egress window and guard height on final. Home owner is aware of the issues. Also noted that new stairs are not code compliant, bottom riser is 63/8 inch riser height and top riser is only 21/2 inch riser height. Home owner has been made aware of this and that it will need to be made code compliant prior to final.
|
BLD-Wall Bracing | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | FAIL |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Provide egress window in bonus room and provide min. 36 inch guard next to stairs.
|
BLD-Framing/Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | FAIL |
Mike Jordan
|
|
|
request first in AM // Mike Phone #: ###-####. Provide staple conversion from engineer as well as fix for holdowns at front of garage.
|
BLD-Conference | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | DONE |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Mike Jordan
|
|
|
Bryan Phone #: ###-####
|
BLD-Footing | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PART |
Mike Jordan
|
|
|
Brian-please call when on way Phone #: ###-####
|
BLD-Footing | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | CANC |
Brandon Shaw
|
|
|
Brian Phone #: ###-####-plan mod is on footing details so cancelled inspection customer will call back in when plans are approved
|
BLD-Footing | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | NR |
Jim Sly
|
|
|
Brian Phone #: ###-#### No approved plans on site
|