BLD-Final | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Jim Sly
|
|
|
Penny Phone #: ###-#### OK for Perm. Occ.
|
FIRE-Final Inspection | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Please call ahead // Jessica Phone #: ###-####
|
BLD-Conference | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | NR |
Jim Sly
|
|
|
Jessica Phone #: ###-#### Need Fire Final.
|
FIRE-Final Inspection | 5/31/2018 | 6/21/2018 | 6/21/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need city approved plans, need annual inspection for the fire extinguisher and verification of annual inspection for the fire sprinkler system.
Jessica Phone #: ###-####
|