BLD-Conference | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | DONE |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Conference | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | DONE |
Brandon Shaw
|
|
|
Pre-final walk thru...
|
BLD-Conference | 6/20/2019 | 6/20/2019 | 6/20/2019 | A | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Aging Inspection | 6/20/2019 | 6/20/2019 | 6/20/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | PEND |
Brandon Shaw
|
|
|
OK to insulate pending..."cpvc piping compatibility with the insulation spray foam needs to be verified prior to cover on any of the vertical sprinkler lines." As per Troy Cobbley...
|
BLD-Foundation | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | CANC |
Brandon Shaw
|
|
|
Inspection requested via web by Ben Sears.Pool permit is BLD18-03830
|
BLD-Footing | 11/8/2018 | 11/9/2018 | 11/9/2018 | P | CANC |
Brandon Shaw
|
|
|
Retaining wall
|
BLD-Footing | 11/8/2018 | 11/8/2018 | 11/8/2018 | A | NR |
Brandon Shaw
|
|
|
Need soil sub-grade submitted and approved by PW...
|
BLD-Wall Bracing | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PART |
Dave Hannah
|
|
|
call 1 hr before to meet (will be in nampa) // mike Phone #: ###-#### needs to install 6 hold downs retro 3 ok to rap house
|
BLD-Foundation | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears Work in progress.....appears OK.
|
BLD-Foundation | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ben Sears Inspection cancelled from web by: Ben Sears
|
BLD-Footing | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress Last footing pour for this permit
|
BLD-Foundation | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress- rain/standing water
|
BLD-Footing | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | NR |
Brandon Shaw
|
|
|
Dewater and clear sediment/mud as needed
|