Description |
(ST. LUKE’S – 27TH STREET DEVELOPMENT – HOSPITAL AND MEDICAL OFFICE BUILDING – ENVELOPE AND TENANT IMPROVEMENT PACKAGE) (DRH17-00427) (CUP17-00057) The fire sprinkler system is used for occupancy. To complete the envelope and tenant improvement phase (Package II) for a new hospital and medical office building. This building has a total floor area of about 223,500 square feet (about 73,500 square feet 1st story, about 71,500 square feet 2nd story, about 53,500 square feet 3rd story, and about 25,000 square feet 4th story). The hospital portion (about 121,000 square feet total) is 3 stories tall with a penthouse and the medical office portion (about 102,500 square feet total) is 4 stories tall with a penthouse. The concrete and structural steel phase was done under permit BLD17-04285. Work is to include insulated metal stud exterior walls (masonry veneer, metal composite wall panels, metal wall panels, EIFS, etc.), exterior windows, exterior doors, roof insulation installed on top of the steel roof deck, membrane roof coverings, steel roofing, interior nonbearing walls, interior doors, interior windows, several multi-user toilet rooms accessible to the disabled, several single-user toilet rooms accessible to the disabled, 30 hospital sleeping rooms accessible to the disabled (except for toilets in bariatric toilet rooms), hospital operating rooms, storage rooms, exam rooms, 2-hr fire barrier walls to function as occupancy separations and to also comply as smoke barriers between the hospital and medical office (also required to function as a horizontal exit on the 2nd story so that the maximum travel distance will not exceed 200 feet long), 2-hr fire barrier walls to create 4 stairway enclosures, an open stairway between the 1st and 2nd stories within the B Occupancy, 1-hr smoke barrier walls within the hospital to create smoke compartments, 1-hr fire barrier walls to create incidental use separations within the hospital, smoke partitions to create hospital care suites, smoke partitions to create I-2 rated corridors within the hospital, three elevators to serve 4 stories (one of the elevators extends to the roof), three elevators within the hospital to serve 3 stories, a mechanical penthouse above the hospital portion, a mechanical penthouse above the medical office portion, a full service kitchen within the hospital portion on the 1st story (Type I grease hood and duct system, Type II dishwasher hood and duct system, walk-in cooler, walk-in freezer, etc.), a dining area on the 1st story of the hospital, structural support for medical equipment (MRI, CT, X-ray, patient lifts, exam lights, etc.), structural support for folding partitions and air plenums, suspended acoustical ceilings, suspended gypsum board ceilings, millwork, and finishes. Three exterior canopies, a fenced rehab yard, and a fenced utility yard (generator, transformers, cooling tower, trash compactors, etc.) will also be constructed under this permit. Special Inspection is required for concrete, masonry, steel (including welding and bolting), fire-resistance coatings, fire stopping, and anchors post-installed in hardened concrete. This permit is intended to establish a Certificate of Occupancy for the entire building. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72, including the smoke detection system, as regulated by the Fire Department. **CJW**
|