BLD-Final | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Jim Storey
|
|
|
You are fine to go in the gate on the left side. It is open. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | NH |
Brandon Shaw
|
|
|
Installer Jimmy Nunley Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 4/18/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Jim Storey
|
|
|
Early PM inspection would be the best, if possible. Jimmy will be doing the installation and his cell number ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|